Beckton (Biomass , Active) Location in the UK : England, E6 7FB Type of installation: Biomass on/offshore: on Turbines :0 Capacity : 19 MW Approx Date of 1st power generation: March 2015
/YES
Beckton Energy Limited CHiP PlantArmada WayNewhamLondon E6 7FB England
Relationship |
Company (For:
Beckton
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Beckton Gas Pressure Reduction Station 19 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
Greater London Country: England LPA: Newham London Borough Council
|
Site ID and Reference: |
143 / H0060
District:
|
Applicant: |
Icon, EEA Holdings & 2OC consortium
Application :
10/00092/LTGDC
|
(Go to search to find Application) |
Site Address: |
Beckton Sewage Treatment Works
|
|
|
County: |
Greater London Region: London
|
OS Coordinates: |
545005 / 545005
|
Development Status: |
Operational
|
Application Submitted: |
1/15/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/30/2013
|
|
|
Generator Live |
3/30/2015
|
This Record Last Updated: |
5/7/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Beckton
|
Generator Type: |
Biomass (e.g. Plant or animal matter)
|
Scheme : |
REGO
|
Generator ID: |
G01633BWEN
|
Capacity: |
16772
|
Status: |
Live
|
Accreditation Date: |
1/15/2010
|
|
|
Commission Date: |
3/30/2015
|
|
|
Applicant: |
Beckton Energy Limited
|
Applicant Address: |
1 Glass Wharf
Bristol
BS2 0ZX
England
|
Address: |
Beckton Energy Limited CHiP Plant
Armada Way
Newham
London
E6 7FB
England
|
|
Assumptions: Capacity: 16772kW 16.772 MW, Thus over the month Capacity * 720 hours per month = 12075.84 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 9794 | 58.39% | Issued | 01/03/2018 | | | 7617 | 45.41% | Issued | 01/02/2018 | | | 5824 | 34.72% | Issued | 01/02/2018 | | | 338 | 2.02% | Issued | 01/02/2018 | | | 1444 | 8.61% | Issued | 01/01/2018 | | | 412 | 2.46% | Issued | 01/01/2018 | | | 572 | 3.41% | Issued | 01/01/2018 | | | 7414 | 44.20% | Issued | 01/12/2017 | | | 1008 | 6.01% | Issued | 01/12/2017 | | | 10 | 0.06% | Issued | 01/12/2017 | | | 56 | 0.33% | Issued | 01/11/2017 | | | 218 | 1.30% | Issued | 01/11/2017 | | | 3466 | 20.67% | Issued | 01/11/2017 | | | 1122 | 6.69% | Issued | 01/10/2017 | | | 776 | 4.63% | Issued | 01/10/2017 | | | 237 | 1.41% | Issued | 01/10/2017 | | | 3868 | 23.06% | Issued | 01/09/2017 | | | 465 | 2.77% | Issued | 01/09/2017 | | | 204 | 1.22% | Issued | 01/09/2017 | | | 3850 | 22.95% | Issued | 01/08/2017 | | | 6849 | 40.84% | Issued | 01/08/2017 | | | 595 | 3.55% | Issued | 01/08/2017 | | | 388 | 2.31% | Issued | 01/07/2017 | | | 273 | 1.63% | Issued | 01/07/2017 | | | 4619 | 27.54% | Issued | 01/07/2017 | | | 352 | 2.10% | Issued | 01/06/2017 | | | 392 | 2.34% | Issued | 01/06/2017 | | | 3732 | 22.25% | Issued | 01/06/2017 | | | 212 | 1.26% | Issued | 01/05/2017 | | | 1681 | 10.02% | Issued | 01/05/2017 | | | 401 | 2.39% | Issued | 01/05/2017 | | | 6448 | 38.45% | Issued | 01/04/2017 | | | 3764 | 22.44% | Issued | 01/04/2017 | | | 247 | 1.47% | Issued | 01/04/2017 | | | 1366 | 8.14% | Issued | 01/03/2017 | | | 1344 | 8.01% | Redeemed | 01/03/2017 | | | 4168 | 24.85% | Issued | 01/03/2017 | | | 266 | 1.59% | Issued | 01/02/2017 | | | 748 | 4.46% | Redeemed | 01/02/2017 | | | 6383 | 38.06% | Issued | 01/02/2017 | | | 352 | 2.10% | Issued | 01/01/2017 | | | 590 | 3.52% | Redeemed | 01/01/2017 | | | 4300 | 25.64% | Issued | 01/01/2017 | | | 287 | 1.71% | Issued | Dec-16 | 0 | 6811 | 253 | 1.51% | Issued | Nov-16 | 0 | 6000 | 212 | 1.26% | Issued | Oct-16 | 0 | 1316 | 1018 | 6.07% | Issued | Sep-16 | 0 | 5945 | 189 | 1.13% | Issued | Aug-16 | 0 | 197 | 469 | 2.80% | Issued | Jul-16 | 0 | 1459 | 1015 | 6.05% | Issued | Jun-16 | 0 | 0 | 7 | 0.04% | Issued | Jun-16 | 0 | 0 | 7 | 0.04% | Issued | Apr-16 | 0 | 0 | 4 | 0.02% | Issued | Feb-16 | 0 | 9079 | 244 | 1.45% | Issued | Jan-16 | 0 | 6859 | 203 | 1.21% | Redeemed | Dec-15 | 0 | 7299 | 3357 | 20.02% | Issued | Nov-15 | 0 | 2658 | 79 | 0.47% | Issued | Oct-15 | 0 | 1093 | 48 | 0.29% | Issued | May-15 | 417 | 123 | 37 | 0.22% | Redeemed | Apr-15 | 97 | 0 | 1 | 0.01% | Redeemed | Mar-15 | 87 | 125 | 1 | 0.01% | Redeemed |
|
Project Info |
BECKTON: Could 'poo power' help heat the country? Human waste has long been seen as a by-product, but Thames Water claims it saved £15m last year, and generated 14% of its power, from either burning sludge or methane derived from its 13 million customers' toilets.
2OC's Fat-fuelled Power Plant, BECKTON OC, a green utility company based in the UK, is setting up a combined heat and intelligent power (CHiP) plant at BECKTON in east London. The plant will be located adjacent to the National Grid Gas Pressure Reduction Station
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|