Loading
Page views this IP this session = 9 of 10 unsubscribed pagesLimes Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Limes Wind Farm (Wind , Active) Location in the UK : England, HU12 8TH Type of installation: Wind on/offshore: on Turbines :2 Capacity : 1.7 MW Approx Date of 1st power generation: January 2015
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Countryside Solutions Operational
Single turbine 67 metres to tip
Model: |
Gamesa G58
|
Start Speed: |
6
|
Capacity: |
0.85
|
Optimal Speed: |
13
|
Rotor Diameter: |
58
|
Stop Speed: |
24
|
Hub Height |
55 Avg for all turbines:0
|
Avg. Elevation: |
3
|
Web Page: |
http://www.gamesacorp.com/en/products-and-services/gamesa-g58-850-kw-en.html |
Comment: |
|
The Limes Staithes Road Preston HU12 8TH England
Relationship |
Company (For:
Limes
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
The Limes Wind Turbines 1.7 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: East Riding of Yorkshire Council
|
Site ID and Reference: |
3807 / AA389
District:
|
Applicant: |
Broadview Energy
Application :
11/01980/STPLFE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
0.84999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
1.7 |
Site Address: |
to the west of Staithes Road at Salt End, Hull.
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
516489 / 516489
|
Development Status: |
Operational
|
Application Submitted: |
5/9/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/12/2014
|
|
|
Generator Live |
1/15/2015
|
This Record Last Updated: |
7/3/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Limes
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02631NWEN
|
Capacity: |
1499
|
Status: |
Live
|
Accreditation Date: |
5/9/2011
|
|
|
Commission Date: |
11/28/2014
|
|
|
Applicant: |
Maryland Renewables Ltd
|
Applicant Address: |
First Floor
14 City Road
London
EC1Y 2AA
England
|
Address: |
The Limes
Staithes Road
Preston
HU12 8TH
England
|
|
Assumptions: Capacity: 1499kW 1.499 MW, Thus over the month Capacity * 720 hours per month = 1079.28 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 28 | 1.87% | Issued | | | | 240 | 16.01% | Issued | Mar-16 | 0 | 0 | 268 | 17.88% | Redeemed | Feb-16 | 0 | 0 | 399 | 26.62% | Redeemed | Jan-16 | 0 | 0 | 424 | 28.29% | Redeemed | Dec-15 | 0 | 0 | 230 | 15.34% | Redeemed | Nov-15 | 0 | 0 | 482 | 32.15% | Redeemed | Oct-15 | 0 | 0 | 199 | 13.28% | Redeemed | Sep-15 | 0 | 0 | 147 | 9.81% | Redeemed | Aug-15 | 0 | 0 | 227 | 15.14% | Redeemed | Jul-15 | 183 | 0 | 182 | 12.14% | Redeemed | Jun-15 | 216 | 0 | 1 | 0.07% | Redeemed | May-15 | 348 | 0 | 347 | 23.15% | Redeemed | Apr-15 | 217 | 0 | 217 | 14.48% | Redeemed | Mar-15 | 403 | 0 | 403 | 26.88% | Redeemed | Feb-15 | 297 | 0 | 297 | 19.81% | Redeemed | Jan-15 | 446 | 0 | 447 | 29.82% | Redeemed | Dec-14 | 348 | 0 | 348 | 23.22% | Redeemed | | | | 400 | 26.68% | Issued | | | | 380 | 25.35% | Issued | | | | 353 | 23.55% | Issued | | | | 235 | 15.68% | Issued | | | | 327 | 21.81% | Issued | | | | 232 | 15.48% | Issued | | | | 443 | 29.55% | Issued | | | | 434 | 28.95% | Issued | | | | 207 | 13.81% | Issued | | | | 286 | 19.08% | Issued |
|
Capacity: 1.7 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 0 m/s (0 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Proposed Wind Turbines on Staithes Road, Saltend
Bourne solar farm is connected to National Grid A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid.
LIMES Farm in Spalding Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.
Bourne solar farm is connected to National Grid LIMES Farm in Spalding Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.
Bourne solar farm is connected to National Grid A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid.LIMES Farm in Spalding Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|