Loading
Page views this IP this session = 6 of 10 unsubscribed pagesHill of Easterton Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Hill of Easterton Wind Farm (Wind , Active) Location in the UK : Scotland, Aberdeenshire Type of installation: Wind on/offshore: on Turbines :3 Capacity : 2.5 MW Approx Date of 1st power generation: July 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Mackies Dairy
Ice cream manufacturers Mackie's of Scotland have their own energy supply - three Vestas V52 wind turbines - referred to as "Mackie's", "Ice" and "Cream". Each of these graceful machines have a 45 metre turbine and three 25 metre blades on the turning propeller and capacity to produce 850KW of power - so a total capacity at the farm of 2.5 MW.
Wind turbines are not a new sight on the farm, Mac's father Maitland previously installed a smaller turbine which powered the business's former piggery unit until 1997. That was one of the first grid connected wind turbines in the UK but did not have a very large output.
Model: |
Vestas V52-850
|
Start Speed: |
2.5
|
Capacity: |
0.85
|
Optimal Speed: |
6.5
|
Rotor Diameter: |
52
|
Stop Speed: |
12
|
Hub Height |
45 Avg for all turbines:45
|
Avg. Elevation: |
222
|
Web Page: |
http://www.nrg-http://www.nrg-systems.hu/dok/V52_UK.pdf |
Comment: |
|
Mackies Hill of Easterton Wind Turbine - D Hill of Easterton Scotland
Relationship |
Company (For:
Hill of Easterton
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hill of Easterton Extension 2 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3812 / AA420
District:
|
Applicant: |
Mackies Limited
Application :
APP/2011/2120
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.3 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
375650 / 375650
|
Development Status: |
Planning Permission Refused
|
Application Submitted: |
6/15/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/24/2012
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/25/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/24/2012 |
Site Name: |
Hill of Easterton Extension 2 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
4056 / N00419W
District:
|
Applicant: |
Mackies
Application :
APP/2005/3308
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
1 |
Height of Turbines: |
|
Calculated capacity: |
2 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
376449 / 376449
|
Development Status: |
Operational
|
Application Submitted: |
9/28/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
7/31/2007
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hill of Easterton 2.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3532 / EN00082
District:
|
Applicant: |
Mackies
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
2.5 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
376449 / 376449
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/2005
|
This Record Last Updated: |
10/1/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Mackies Hill of Easterton Wind Turbine - D
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00054SQSC
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/1/2005
|
|
|
Applicant: |
Mackies Limited
|
Applicant Address: |
Mackies Of Scotland
Westertown
Rothienorman
Inverurie
AB51 8US
Scotland
|
Address: |
Mackies Hill of Easterton Wind Turbine - D
Hill of EastertonScotland
Scotland
|
Site Name: |
Mackies Hill of Easterton Wind Turbine - D
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00267NWSC
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/1/2005
|
|
|
Applicant: |
Mackies Limited
|
Applicant Address: |
Mackies Of Scotland
Westertown
Rothienorman
Inverurie
AB51 8US
Scotland
|
Address: |
Mackies Hill of Easterton Wind Turbine - D
Hill of EastertonScotland
Scotland
|
|
Assumptions: Capacity: 2550kW 2.55 MW, Thus over the month Capacity * 720 hours per month = 1836 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 468 | 18.35% | Issued | 01/04/2018 | | | 222 | 8.71% | Issued | 01/04/2018 | | | 152 | 5.96% | Issued | 01/03/2018 | | | 218 | 8.55% | Issued | 01/02/2018 | | | 270 | 10.59% | Issued | 01/01/2018 | | | 233 | 9.14% | Issued | 01/12/2017 | | | 247 | 9.69% | Issued | 01/11/2017 | | | 256 | 10.04% | Issued | 01/11/2017 | | | 519 | 20.35% | Issued | 01/10/2017 | | | 489 | 19.18% | Issued | 01/10/2017 | | | 248 | 9.73% | Issued | 01/09/2017 | | | 233 | 9.14% | Issued | 01/09/2017 | | | 354 | 13.88% | Issued | 01/08/2017 | | | 194 | 7.61% | Issued | 01/08/2017 | | | 158 | 6.20% | Issued | 01/07/2017 | | | 184 | 7.22% | Issued | 01/07/2017 | | | 198 | 7.76% | Issued | 01/06/2017 | | | 220 | 8.63% | Issued | 01/06/2017 | | | 258 | 10.12% | Issued | 01/05/2017 | | | 216 | 8.47% | Issued | 01/05/2017 | | | 217 | 8.51% | Issued | 01/04/2017 | | | 380 | 14.90% | Issued | 01/04/2017 | | | 304 | 11.92% | Issued | 01/03/2017 | | | 486 | 19.06% | Redeemed | 01/02/2017 | | | 768 | 30.12% | Redeemed | 01/01/2017 | | | 725 | 28.43% | Redeemed | Dec-16 | 0 | 662 | 662 | 25.96% | Issued | Nov-16 | 0 | 537 | 537 | 21.06% | Issued | Oct-16 | 0 | 493 | 493 | 19.33% | Issued | Oct-16 | 0 | 0 | 493 | 19.33% | Issued | Sep-16 | 0 | 511 | 511 | 20.04% | Issued | Aug-16 | 0 | 459 | 459 | 18.00% | Issued | Jul-16 | 0 | 200 | 202 | 7.92% | Issued | Jul-16 | 0 | 200 | 202 | 7.92% | Issued | Jun-16 | 0 | 455 | 455 | 17.84% | Issued | May-16 | 0 | 562 | 562 | 22.04% | Issued | Apr-16 | 0 | 538 | 538 | 21.10% | Issued | Feb-16 | 0 | 670 | 670 | 26.27% | Redeemed | Jan-16 | 0 | 886 | 886 | 34.75% | Redeemed | Dec-15 | 0 | 960 | 960 | 37.65% | Redeemed | Nov-15 | 0 | 629 | 629 | 24.67% | Redeemed | Oct-15 | 0 | 450 | 453 | 17.76% | Redeemed | Sep-15 | 0 | 563 | 563 | 22.08% | Redeemed | Aug-15 | 0 | 537 | 537 | 21.06% | Redeemed | Jul-15 | 451 | 453 | 453 | 17.76% | Redeemed | Jun-15 | 403 | 404 | 404 | 15.84% | Redeemed | May-15 | 603 | 604 | 604 | 23.69% | Redeemed | Apr-15 | 434 | 434 | 437 | 17.14% | Redeemed | Mar-15 | 603 | 605 | 605 | 23.73% | Redeemed | Feb-15 | 742 | 743 | 743 | 29.14% | Redeemed | Jan-15 | 965 | 966 | 966 | 37.88% | Redeemed | Dec-14 | 768 | 768 | 768 | 30.12% | Redeemed | Nov-14 | 572 | 574 | 574 | 22.51% | Redeemed | Oct-14 | 723 | 724 | 724 | 28.39% | Redeemed | Sep-14 | 283 | 283 | 285 | 11.18% | Redeemed | Aug-14 | 533 | 535 | 535 | 20.98% | Redeemed | Jul-14 | 295 | 296 | 299 | 11.73% | Redeemed | Jun-14 | 248 | 248 | 250 | 9.80% | Redeemed | May-14 | 301 | 302 | 303 | 11.88% | Redeemed | Apr-14 | 431 | 431 | 431 | 16.90% | Redeemed | Mar-14 | 606 | 608 | 608 | 23.84% | Redeemed | Feb-14 | 863 | 863 | 863 | 33.84% | Expired | Jan-14 | 932 | 933 | 933 | 36.59% | Redeemed | Dec-13 | 923 | 924 | 924 | 36.24% | Redeemed | Nov-13 | 618 | 618 | 618 | 24.24% | Redeemed | Oct-13 | 689 | 690 | 689 | 27.02% | Redeemed | Sep-13 | 553 | 555 | 555 | 21.76% | Redeemed | Aug-13 | 349 | 349 | 352 | 13.80% | Redeemed | Jul-13 | 233 | 233 | 236 | 9.25% | Redeemed | Jun-13 | 277 | 277 | 280 | 10.98% | Redeemed | May-13 | 738 | 739 | 739 | 28.98% | Redeemed | Apr-13 | 621 | 623 | 623 | 24.43% | Redeemed | Mar-13 | 599 | 600 | 600 | 23.53% | Redeemed | Feb-13 | 519 | 521 | 521 | 20.43% | Redeemed | Jan-13 | 481 | 482 | 482 | 18.90% | Redeemed | Dec-12 | 791 | 792 | 792 | 31.06% | Redeemed | Nov-12 | 578 | 579 | 579 | 22.71% | Redeemed | Oct-12 | 373 | 375 | 375 | 14.71% | Redeemed | Sep-12 | 547 | 549 | 549 | 21.53% | Redeemed | Aug-12 | 396 | 396 | 398 | 15.61% | Redeemed | Jul-12 | 341 | 341 | 342 | 13.41% | Redeemed | Jun-12 | 396 | 398 | 398 | 15.61% | Redeemed | May-12 | 341 | 341 | 343 | 13.45% | Redeemed | Apr-12 | 491 | 493 | 493 | 19.33% | Redeemed | Mar-12 | 546 | 548 | 548 | 21.49% | Redeemed | Feb-12 | 723 | 724 | 724 | 28.39% | Redeemed | Jan-12 | 840 | 841 | 841 | 32.98% | Redeemed | Dec-11 | 786 | 787 | 787 | 30.86% | Redeemed | Nov-11 | 816 | 816 | 816 | 32.00% | Redeemed | Oct-11 | 826 | 826 | 826 | 32.39% | Redeemed | Sep-11 | 678 | 680 | 680 | 26.67% | Redeemed | Aug-11 | 403 | 402 | 405 | 15.88% | Redeemed | Jul-11 | 458 | 460 | 460 | 18.04% | Redeemed | Jun-11 | 319 | 319 | 321 | 12.59% | Redeemed | May-11 | 646 | 647 | 647 | 25.37% | Redeemed | Apr-11 | 408 | 410 | 410 | 16.08% | Redeemed | Mar-11 | 535 | 535 | 535 | 20.98% | Redeemed | Feb-11 | 743 | 745 | 745 | 29.22% | Redeemed | Jan-11 | 448 | 448 | 448 | 17.57% | Redeemed | Dec-10 | 553 | 555 | 555 | 21.76% | Redeemed | Nov-10 | 679 | 680 | 680 | 26.67% | Redeemed |
|
Capacity: 5.1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|