Lynemouth Biomass Energy

Lynemouth (Biomass , Active)

 General Information.

Location in the UK : England, Northumberland    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 420 MW
Approx Date of 1st power generation: 21/11/2018

/YES

 Comment

As of February 2014, biomass conversion is still intended to go ahead: The RES Group is looking to build a £350m biomass power station there, and another scheme involves Lynemouth Power Station, which aims to convert to biomass by 2015.

This is a unique UK Power station which is undergoing a sale process from Alcan to Curen, a subsidiary of RWE. Because this was/ is a dedicated coal fired station that was used for aluminium smelting it does not necessarily conform to regulations, for supplying the National Grid. The new owners want to convert it to a biomass plant as detailed in the summary of an exemption application that would allow the station to remain open.

 Address

 Associated Companies.

Relationship Company (For: Lynemouth )
OperatorRWE Innogy
OwnerRWE Innogy

 DECC Data on this Project: Lynemouth :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Lynemouth Power Station     420 MW
Energy Type: Biomass (dedicated)
County: Northumberland     Country: England     LPA: Northumberland County Council
Site ID and Reference: 115 / AA430     District:
Applicant: Lynemouth Power     Application : (Go to search to find Application)
Site Address: Woodhorn Ashington Northumberland
  NE63 9YH
County: Northumberland Region: North East
OS Coordinates: 429850 / 429850
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/1/2016    
Generator Live 11/21/2018 This Record Last Updated: 11/21/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Lynemouth: Biomass :

Site Name: Alcan Lynemouth Power Station
Generator Type: Biodegradable (REGO code = MW)
Scheme : REGO Generator ID: G00676MWEN
Capacity: 396000 Status: Live
Accreditation Date:    
Commission Date: 5/1/2003    
Applicant: Lynemouth Power Station
Applicant Address: Lynemouth Power Station ASHINGTON NE63 9NW England
Address: Alcan Lynemouth Power Station Alcan Smelting and Power UK - B C DLynemouth Works Power StationAshingtonNorth NE63 9NW England
 
Assumptions: Capacity: 396000kW 396 MW,
Thus over the month Capacity * 720 hours per month = 285120 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
Nov-13 547164 582 0.15% Expired
Oct-13 1178354 1254 0.32% Expired
May-13 6720 71 0.02% Expired
Apr-13 1422427 1518 0.38% Expired
Mar-13 753377 804 0.20% Expired
Aug-11 121686084 12909 3.26% Expired
Jul-11 22491124 228 0.06% Redeemed
Jun-11 711355 633 0.16% Expired
May-11 635318 105 0.03% Redeemed
Apr-11 303152 263 0.07% Expired
Dec-10 466233 492 0.12% Expired
Nov-10 44842242 1202 0.30% Redeemed
Oct-10 25231261 2004 0.51% Expired

Project Info
LYNEMOUTH power station (Wiki)

Lynmouth Power Exemption Application

NECC Supports LYNEMOUTH Power Station Licence Exemption
NECC has written to the Department of Energy and Climate Change in support of the Secretary of State’s proposal to grant a licence exemption to the proposed new owners of the LYNEMOUTH Power Station.

17ft hedge would hide turbine views - Fenrother
The Energiekontor submission accepts that Moor Edge House would have direct views of the turbines, as well as existing ones at LYNEMOUTH and Bewick Drift,

Another record year for Port of Blyth as turnover hits £17.5m
The RES Group is looking to build a £350m biomass power station there, and another scheme involves LYNEMOUTH Power Station, which aims to convert to biomass by 2015.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School