Page views this IP this session = 2 of 10 unsubscribed pagesFawley Energy from Waste Plant
Fawley (Waste , Active, Waste - EFW) Location in the UK : England, Fawley, Southampton Type of installation: Waste on/offshore: on Turbines :0 Capacity : 8.6 MW Approx Date of 1st power generation: June 2001
/YES
DEBUG comment: caniedit 1 = public DEBUG comment: caniedit 2 = public DEBUG comment SQL: select * from [energymaplocs].[dbo].vmycomment where main_id=1928 and typeofcomment <> 'delete' and ( added_by = 0 or typeofcomment = 'public' ) The waste to energy plant exports 34,000 megawatt hours of electricity every year – enough to supply 7250 UK households., capacity to process up to 6,000 tonnes of waste ( Oil Sludges, Contaminated wood, Meat and bone meal) per annum.
Address Charleston Road Hardley, Hythe, Southampton SO45 3NX Charlestown Road Hardley Hythe Hardley Southampton SO45 3ZA England
Relationship |
Company (For:
Fawley
) |
DBUG:SQL Command = select top 40 * from energymaplocs.dbo.vco_proj_type where cp_project = 1928 order by c_compname asc Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
got here Got here pop 2 projectid = 1928 vdeccref = DEBUG decclib sql = select *, [Installed Capacity (Elec)] as installed_capacity, [Contractor (/Applicant)] as contractor from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'DECC' and dop_project = '1928' order by [planning application submitted] desc
Site Name: |
Fawley Waste to Energy Plant 8.6 MW
|
Energy Type: |
EfW Incineration |
County: |
Hampshire Country: England LPA: New Forest District Council
|
Site ID and Reference: |
1015 / N00040M
District:
|
Applicant: |
Tradebe
Application :
70529
|
(Go to search to find Application) |
Site Address: |
Charleston Road, Hardley Hythe, Southampton
|
|
|
County: |
Hampshire Region: South East
|
OS Coordinates: |
443772 / 443772
|
Development Status: |
Operational
|
Application Submitted: |
10/31/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
6/1/2001
|
This Record Last Updated: |
7/6/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
DEBUG Ofgemlib sql = select * from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'OFGEM' and dop_project = '1928' order by CommissionDate desc
Site Name: |
Fawley Waste to Energy Plant (RA) - A,B
|
Generator Type: |
Fuelled
|
Scheme : |
RO
|
Generator ID: |
R00002RAEN
|
Capacity: |
8600
|
Status: |
Live
|
Accreditation Date: |
10/31/2000
|
|
|
Commission Date: |
6/1/2001
|
|
|
Applicant: |
Willacy Guinard Holdings limited
|
Applicant Address: |
Tradebe Fawley
Charleston Road
Hardley, Hythe
Southampton
SO45 3NX
England
|
Address: |
Fawley Waste to Energy Plant
Charlestown RoadHardley
HytheHardleySouthampton
SO45 3ZA
England
|
Project Info |
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Fawley%' and type_id=2 or (type_id=6 and project_id = 1928 ) order by dated desc' ViewEdit = 1 DocTypeID = 9 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Fawley%' and type_id=2 or (type_id=6 and project_id = 1928 ) order by dated descAn idyll blighted by 18,000 solar panels Photographer Tim Woodcock, 54, captured the image from a helicopter while flying more than 1,000ft above the solar array near FAWLEY.
The energy saving farm on the Cadland Estate uses photo-voltaic panels to produce five megawatts of power.
FAWLEY Waste to Energy Plant
Cadland Estate at FAWLEY in Hampshire ‘It is very easy to say that a system is ‘green’ when all the energy and environmental damage and cost is made elsewhere.’
Solar panel farm switched on in New Forest One of the UK's largest ground-mounted solar farms has been switched on in Hampshire.
Energy firm Anesco has erected 18,000 panels on 30 acres of farmland on the Cadland Estate, near FAWLEY, in the New Forest.
|
|
©2018
Simon Mallett |
Latest News Added |
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated desc' ViewEdit = 1 DocTypeID = 2 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated descLarport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017