ONDBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718095 between ipint_start and ipint_end
Sorry I found no matches, Please try again. 176
DBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718095 between ipint_start and ipint_end
DEBUG: sql = insert into [energymaplocs].dbo.visitor (visitorip, visitorint, vREMOTE_HOST,visitdate, visitpage, getdatevisit, visitproject, visitorindustryid, [host_id]) values ('216.73.216.15', '3628718095', '216.73.216.15' ,'20250918 20:33:6','/project.asp?pageid=1893' ,getdate() ,1893 , 0, 1)
winddate 1 =
vid = 1893select top 1 * from [energymaplocs].[dbo].vmain where id=1893
pws_id = 37pws_id = 37
--------------------------------------------------------
(825) Page Access Control Pageid = 1893
session(cansee) = NO
vservicetype =
vindustry = 0
vhostname =
vvisitor_rec = 1
vdonesurvey1 =
vaccesstodata = 0
value= -2 Show DandH
value = -1 Delay+Message
value=0 Public
value=1 Education
value=2 Search Engine
value=3 All Data
value=4 User
value=5 Admin
/ / 1session(custall):

Page views from this IP Range (Company) : All time = this month = today =
This IP this session = ( of 10)NO -/- YESWSHWS: ||||| showdata:NO WindNot Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 216.73.216.15
countall =
countmonth =
countday =
site_type = Wind
This IP this session = 1(0)Cansee = YES
ip2num = 3628718095 hostname = visitor_rec = 1 ipint_start = ipint_end = {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Lambs Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Lambs Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Teeside, Stillington    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 14 MW
Approx Date of 1st power generation: January 2017

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

DEBUG comment: caniedit 1 = public
DEBUG comment: caniedit 2 = public
DEBUG comment SQL: select * from [energymaplocs].[dbo].vmycomment where main_id=1893 and typeofcomment <> 'delete' and ( added_by = 0 or typeofcomment = 'public' )
Stillington Industrial Estate, Stockton, village of Stillington, to the north west of Stockton and around three miles east of the A1(M)

Plans for a new energy generation project on Teesside, encompassing a wind farm and a combined heat and power (CHP) scheme, are set to go on show at a public exhibition.

County Durham firm Banks Developments has prepared an initial scoping report for the proposed development, which would be located around the village of Stillington, to the north west of Stockton and around three miles east of the A1(M).

Proposals are being considered for a Combined Heat and Power (CHP) facility in the adjacent Stillington Industrial Estate.

 Turbine Make and Specs

DEBUG generator SQL: select * from [energymaplocs].[dbo].technology where tech_id=41
Model: Senvion MM100 Start Speed: 3
Capacity: 2 Optimal Speed: 11
Rotor Diameter: 100 Stop Speed: 22
Hub Height 75   Avg for all turbines:75 Avg. Elevation: 55
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: Nominal power: 2,000 kW Rotor diameter: 100 m Hub height: 75 – 100 m Wind class: Low to medium Wind Operating temperature range: -20 – +35 °C Rotor surface: 7,854 m²

 Address

Lambs Hill Wind Farm South Street Stillington Stockton on Tees TS211LX England

 Associated Companies.



DBUG:SQL Command = select top 40 * from energymaplocs.dbo.vco_proj_type where cp_project = 1893 order by c_compname asc
Relationship Company (For: Lambs Hill )
DeveloperBanks Renewables
OwnerBanks Renewables

 DECC Data on this Project: Lambs Hill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

got here Got here pop 2 projectid = 1893 vdeccref =
DEBUG decclib sql = select *, [Installed Capacity (Elec)] as installed_capacity, [Contractor (/Applicant)] as contractor from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'DECC' and dop_project = '1893' order by [planning application submitted] desc
Site Name: Lambs Hill     8 MW
Energy Type: Wind Onshore
County: County Durham     Country: England     LPA: Stockton on Tees Borough Council
Site ID and Reference: 4390 / AA018     District:
Applicant: Banks Renewables     Application : 10/2549/EIS (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 8
Site Address: Stillington Industrial Estate, Stockton, village of Stillington, to the north west of Stockton and around three miles east of the A1(M
 
County: County Durham Region: North East
OS Coordinates: 443682 / 443682
Development Status: Operational
Application Submitted: 10/7/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/26/2016    
Generator Live 1/19/2017 This Record Last Updated: 2/2/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Lambs Hill: Wind :

DEBUG Ofgemlib sql = select * from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'OFGEM' and dop_project = '1893' order by CommissionDate desc
Site Name: Lambs Hill
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00387RQEN
Capacity: 7840 Status: Live
Accreditation Date: 10/7/2010    
Commission Date: 12/7/2016    
Applicant: Banks Renewables (Lambs Hill Wind Farm) Ltd
Applicant Address: Inkerman House St Johns Road Meadowfield Durham DH7 8XL England
Address: Lambs Hill Wind Farm South Street Stillington Stockton on Tees TS211LX England

Site Name: Lambs Hill
Generator Type: Wind
Scheme : REGO Generator ID: G03018NWEN
Capacity: 7840 Status: Live
Accreditation Date: 10/7/2010    
Commission Date: 12/7/2016    
Applicant: Banks Renewables (Lambs Hill Wind Farm) Ltd
Applicant Address: Inkerman House St Johns Road Meadowfield Durham DH7 8XL England
Address: Lambs Hill Wind Farm South Street Stillington Stockton on Tees TS211LX England
 


DBUG:SQL Command = select * from energymaplocs.dbo.rego where [Accreditation Number] = 'G03018NWEN' order by output_year desc, output_month desc
Assumptions: Capacity: 7840kW 7.84 MW,
Thus over the month Capacity * 720 hours per month = 5644.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 1723 21.98% Issued
01/03/2018 2301 29.35% Issued
01/02/2018 1916 24.44% Issued
01/01/2018 2681 34.20% Issued
01/12/2017 2544 32.45% Retired
01/11/2017 2506 31.96% Retired
01/10/2017 2712 34.59% Retired
01/09/2017 1555 19.83% Retired
01/08/2017 1630 20.79% Issued
01/07/2017 1464 18.67% Issued
01/06/2017 1913 24.40% Retired
01/05/2017 1512 19.29% Issued
01/04/2017 1887 24.07% Issued
01/03/2017 1953 24.91% Issued
01/02/2017 2422 30.89% Issued
01/01/2017 1740 22.19% Issued

 Calculations


Capacity: 27.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 22 m/s (49.214 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 9/18/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 27.2 start: 5 Optimum: 15/ Stop: 22 / wind: / ratio 37

Project Info
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Lambs Hill%' and type_id=2 or (type_id=6 and project_id = 1893 ) order by dated desc'
ViewEdit = 1 DocTypeID = 9 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Lambs Hill%' and type_id=2 or (type_id=6 and project_id = 1893 ) order by dated descBanks revving up for Scottish pair: LAMBS HILL
four-unit LAMBS HILL wind farm near Stockton-on-Tees in County Durham. Cheetham Hill Construction of Bury is handling civil engineering at the 8MW project.

LAMBS HILL : Non Technical SUmmary

Public Exhibition For Two-Part Teesside Energy Generation Scheme Plans

Windfarm developer in Stockton changes mind at last minute
AN ENERGY company who wanted to drop a noise reduction rule at its windfarm have backed down at the last minute. Banks Renewables won permission to erect four 125m high wind turbines at LAMBS HILL, Stillington, near Stockton, in 2011.

LAMBS HILL campaigners' vow as Stillington wind farm work is halted
Stockton Council had given permission for the development of the four-turbine wind farm on land west of Stillington, near Stockton, in March, and developers Banks Renewables had already begun work.

©2018 Simon Mallett
Latest News Added
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated desc'
ViewEdit = 1 DocTypeID = 2 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated descLarport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School