Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCAT Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
CAT Wind Farm (Wind , Active) Location in the UK : Wales, Mid Wales - Machynlleth Type of installation: Wind on/offshore: on Turbines :0 Capacity : 0 MW Approx Date of 1st power generation:
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Centre for Alternative Technology
Model: |
|
Start Speed: |
|
Capacity: |
|
Optimal Speed: |
|
Rotor Diameter: |
|
Stop Speed: |
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
0
|
Web Page: |
|
Comment: |
|
Relationship |
Company (For:
CAT
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Capacity: 0 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Case Study - Medium Wind n 2016, Green CAT Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidifiCATion
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidifiCATion
Hornsea 2: How big is the worlds largest offshore wind farm? Hornsea Two is loCATed 89km off the Yorkshire coast, adjacent to sister project Hornsea 1. The 1.3GW project comprises 165 wind turbines, which will help power over 1.4 million UK homes with low-cost renewable energy
BP and EnBW to Run Suction Bucket Trials at UK Offshore Wind Farm Sites On 30 December, the vessel North Sea Giant is expected to start suction bucket trials within the array areas of the Mona and Morgan offshore wind farm sites, loCATed off North West England and North Wales.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|