ONDBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718095 between ipint_start and ipint_end
Sorry I found no matches, Please try again. 176
DBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718095 between ipint_start and ipint_end
DEBUG: sql = insert into [energymaplocs].dbo.visitor (visitorip, visitorint, vREMOTE_HOST,visitdate, visitpage, getdatevisit, visitproject, visitorindustryid, [host_id]) values ('216.73.216.15', '3628718095', '216.73.216.15' ,'20250918 20:33:11','/project.asp?pageid=69&pagename=Braich+Ddu+Wind+Farm' ,getdate() ,69 , 0, 1)
winddate 1 =
vid = 69select top 1 * from [energymaplocs].[dbo].vmain where id=69
pws_id = 371374pws_id = 371374
--------------------------------------------------------
Loading
Page views this IP this session = 3 of 10 unsubscribed pagesBraich Ddu Wind Farm Click here for Generation Forecast for wind farms based on Met office data
Braich Ddu Wind Farm (Wind , Active) DEBUG comment: caniedit 2 = public DEBUG comment SQL: select * from [energymaplocs].[dbo].vmycomment where main_id=69 and typeofcomment <> 'delete' and ( added_by = 0 or typeofcomment = 'public' ) Three wind turbines have been generating renewable electricity at Braich Ddu Wind Farm since 2008. Gwynedd Council granted permission for the wind farm, which is located on farmland near the village of Glanrafon. DEBUG generator SQL: select * from [energymaplocs].[dbo].technology where tech_id=8
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted. got here Got here pop 2 projectid = 69 vdeccref = -na- DEBUG decclib sql = select *, [Installed Capacity (Elec)] as installed_capacity, [Contractor (/Applicant)] as contractor from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'DECC' and dop_project = '69' order by [planning application submitted] desc
DEBUG Ofgemlib sql = select * from energymaplocs.dbo.ofgem1 where GeneratorID = '-na-' Capacity: 7.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph) Local Weather Station: Elevation of Weather Station: Date for Wind forecast: 9/18/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
|