Loading
Page views this IP this session = 2 of 10 unsubscribed pagesTwentyshilling Hill Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Twentyshilling Hill Wind Farm (Wind , Agreed/Planning) Location in the UK : Scotland, Sanquhar Dumfries and Galloway Type of installation: Wind on/offshore: on Turbines :9 Capacity : 38 MW Approx Date of 1st power generation: 2021
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Element Power Planning Permission Grant Please Note, Wind farm map for Twentyshilling is simply to place 9 turbines in approximate locations pending exact fixes
Model: |
Vestas V117
|
Start Speed: |
3
|
Capacity: |
3.45
|
Optimal Speed: |
0
|
Rotor Diameter: |
0
|
Stop Speed: |
25
|
Hub Height |
81 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
https://www.vestas.com/en/products/turbines/v117%203_45_mw |
Comment: |
|
Sanquhar, Dumfries and Galloway
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Twentyshilling Hill Wind Farm 37.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
6590 /
District:
|
Applicant: |
Element Power
Application :
18/0206/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
4.2000000000000002 |
Height of Turbines: |
82 |
Calculated capacity: |
37.8 |
Site Address: |
Twentyshilling Hill Wind Farm, Greystone Avenue, Kelloholm, Sanquhar
|
|
DG4 6RY
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
279500 / 279500
|
Development Status: |
Under Construction
|
Application Submitted: |
2/22/2018
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/1/2020
|
|
|
Generator Live |
|
This Record Last Updated: |
1/11/2022
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Twentyshilling Hill Wind Farm 27 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4457 / B0239
District:
|
Applicant: |
Element Power
Application :
13/P/3/0260
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
27 |
Site Address: |
Sanquhar,
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
279500 / 279500
|
Development Status: |
Revised
|
Application Submitted: |
5/28/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/16/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|