Screggagh Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Screggagh Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, Fintona, Co Tyrone    
Type of installation: Wind    on/offshore: on
Turbines :8  Capacity : 20 MW
Approx Date of 1st power generation: March 2011

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Nordex N80 Start Speed: 4
Capacity: 2.5 Optimal Speed: 13
Rotor Diameter: 80 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 183
Web Page: http://vetropark.org/d/59743/d/nordex_n80-n90_gb.pdf
Comment: N80 suits High Wind Areas

 Address

Sreggagh & Stranisk Townlands Fintona BT78 2HF Northern Ireland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Screggagh )

 DECC Data on this Project: Screggagh :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Screggagh     19.5 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 3263 / N00380W     District:
Applicant: Screggagh Windfarm     Application : K/2005/0810/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 20
Site Address: Screggagh, Screggagh & Stranisk townlands, Fintona. Co Tyrone
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 54566 / 54566
Development Status: Operational
Application Submitted: 4/18/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/1/2009    
Generator Live 3/21/2011 This Record Last Updated: 8/1/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Screggagh: Wind : R00053NQNI

Site Name: Screggagh Windfarm
Generator Type: On-shore wind (NIRO code = NQ)
Scheme : RO Generator ID: R00053NQNI
Capacity: 19850 Status: Live
Accreditation Date: 4/18/2005    
Commission Date: 1/12/2011    
Applicant: Screggagh Windfarm Limited
Applicant Address: c/o Heritage Administration Services Limited Unit 18, The Innovation Center, Nisp Queens Road Belfast BT3 9DT Northern Ireland
Address: Screggagh Windfarm Sreggagh & Stranisk Townlands Fintona BT78 2HF Northern Ireland

 Calculations


Capacity: 39
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/3/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 39 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351479

Project Info
Jennings O'Donanvan: SCREGGAGH Wind Farm

Fintona, County Tyrone: 80-metre wind turbine collapses
t was one of eight turbines on the SCREGGAGH wind farm on Murley mountain. The turbine, valued at over £500,000, collapsed on Friday evening, scattering debris over a wide area.

Fintona celebrates £1 million windfall
The Fintona Community investment fund is being provided by the owners of the relatively small eight turbine SCREGGAGH wind farm, built in 2010-11, which is located in the townland of the same name just outside Fintona.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School