ONDBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 59762712 between ipint_start and ipint_end
Sorry I found no matches, Please try again. 176
DBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 59762712 between ipint_start and ipint_end
DEBUG: sql = insert into [energymaplocs].dbo.visitor (visitorip, visitorint, vREMOTE_HOST,visitdate, visitpage, getdatevisit, visitproject, visitorindustryid, [host_id]) values ('3.143.232.24', '59762712', '3.143.232.24' ,'20250504 5:34:40','/project.asp?pageid=310' ,getdate() ,310 , 0, 1)
winddate 1 =
vid = 310select top 1 * from [energymaplocs].[dbo].vmain where id=310
pws_id = 354357pws_id = 354357
--------------------------------------------------------
(825) Page Access Control Pageid = 310
session(cansee) = NO
vservicetype =
vindustry = 0
vhostname =
vvisitor_rec = 1
vdonesurvey1 =
vaccesstodata = 0
value= -2 Show DandH
value = -1 Delay+Message
value=0 Public
value=1 Education
value=2 Search Engine
value=3 All Data
value=4 User
value=5 Admin
/ / 1session(custall):

Page views from this IP Range (Company) : All time = this month = today =
This IP this session = ( of 10)NO -/- YESWSHWS: ||||| showdata:NO WindNot Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.143.232.24
countall =
countmonth =
countday =
site_type = Wind
This IP this session = 1(0)Cansee = YES
ip2num = 59762712 hostname = visitor_rec = 1 ipint_start = ipint_end = {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Penrhiw Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Penrhiw Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, NP12 0ST    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.3 MW
Approx Date of 1st power generation: July 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

DEBUG comment: caniedit 1 = public
DEBUG comment: caniedit 2 = public
DEBUG comment SQL: select * from [energymaplocs].[dbo].vmycomment where main_id=310 and typeofcomment <> 'delete' and ( added_by = 0 or typeofcomment = 'public' )

 Turbine Make and Specs

DEBUG generator SQL: select * from [energymaplocs].[dbo].technology where tech_id=132
Model: EWT DW 61 Start Speed: 2.5
Capacity: 0.5 Optimal Speed: 11.5
Rotor Diameter: 61 Stop Speed: 25
Hub Height 50   Avg for all turbines:0 Avg. Elevation: 446
Web Page: http://www.ewtdirectwind.com/wind-turbines/service-performance.html#c925
Comment:

 Address

Penrhiwgwaith Farm Hollybush Blackwood. NP12 0ST

 Associated Companies.



DBUG:SQL Command = select top 40 * from energymaplocs.dbo.vco_proj_type where cp_project = 310 order by c_compname asc
Sorry I found no matches, Please try again.
Relationship Company (For: Penrhiw )

 DECC Data on this Project: Penrhiw :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

got here Got here pop 2 projectid = 310 vdeccref =
DEBUG decclib sql = select *, [Installed Capacity (Elec)] as installed_capacity, [Contractor (/Applicant)] as contractor from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'DECC' and dop_project = '310' order by [planning application submitted] desc

 OFGEM Data on this Project: Penrhiw: Wind :

DEBUG Ofgemlib sql = select * from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'OFGEM' and dop_project = '310' order by CommissionDate desc

 Calculations


Capacity: 1.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/4/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354357

Project Info
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Penrhiw%' and type_id=2 or (type_id=6 and project_id = 310 ) order by dated desc'
ViewEdit = 1 DocTypeID = 9 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Penrhiw%' and type_id=2 or (type_id=6 and project_id = 310 ) order by dated desc Planning consent granted for South Wales wind turbine
On 17th July 2013 the Blaenau Gwent Council planning committee voted to grant consent for an 86.5 metre / 500kW wind turbine located on land at PENRHIWgwaith Farm, near Tredegar.

©2018 Simon Mallett
Latest News Added
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated desc'
ViewEdit = 1 DocTypeID = 2 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated descLarport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School