Standford Hill Wind Farm (Wind , Active) Location in the UK : England, Eastchurch, Sheppy Type of installation: Wind on/offshore: on Turbines :2 Capacity : 4.6 MW Approx Date of 1st power generation: January 2013
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The proposal for two wind turbines on Ministry of Justice land was granted planning permission by Swale Borough Council’s Planning Committee in June 2011. The construction period is expected to take 5-6 months, with commissioning of the turbines expected in January 2013.
The Community Fund for the Standford Hill wind energy development will amount to at least £11,500 per year (index linked) for the lifetime of the project, normally 25 years.
Model: |
Enercon E82
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
82
|
Stop Speed: |
31
|
Hub Height |
0 Avg for all turbines:80
|
Avg. Elevation: |
5
|
Web Page: |
http://www.enercon.de/en-en/62.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
HMP Standford Hill Chruch Hill Eastchurch Sheerness ME12 4AA England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
HMP Standford Hill 4.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Kent Country: England LPA: Swale Borough Council
|
Site ID and Reference: |
3733 / A0433
District:
|
Applicant: |
Resonance
Application :
SW/10/1567
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
4.6 |
Site Address: |
Standford Hill, Church Road, Eastchurch, Sheerness
|
|
ME12 4AA
|
County: |
Kent Region: South East
|
OS Coordinates: |
598426 / 598426
|
Development Status: |
Operational
|
Application Submitted: |
12/21/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
12/6/2012
|
|
|
Generator Live |
2/8/2013
|
This Record Last Updated: |
3/6/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
PFR Standford Hill Turbines
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02156NWEN
|
Capacity: |
4628
|
Status: |
Live
|
Accreditation Date: |
12/21/2010
|
|
|
Commission Date: |
1/10/2013
|
|
|
Applicant: |
PFR (HMP STANDFORD HILL LIMITED
|
Applicant Address: |
Station House
12 Melcombe Place
London
NW1 6JJ
England
|
Address: |
HMP Standford Hill
Chruch Hill
Eastchurch
Sheerness
ME12 4AA
England
|
|
Assumptions: Capacity: 4628kW 4.628 MW, Thus over the month Capacity * 720 hours per month = 3332.16 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 770 | 16.64% | Issued | | | | 563 | 12.17% | Issued | | | | 1325 | 28.63% | Redeemed | | | | 1267 | 27.38% | Redeemed | 01/01/2017 | | | 863 | 18.65% | Redeemed | 01/12/2016 - 31/12/2016 | 0 | 0 | 734 | 15.86% | Issued | 01/11/2016 - 30/11/2016 | 0 | 0 | 1179 | 25.48% | Issued | 01/10/2016 - 31/10/2016 | 0 | 0 | 838 | 18.11% | Issued | 01/09/2016 - 30/09/2016 | 0 | 0 | 721 | 15.58% | Issued | 01/08/2016 - 31/08/2016 | 0 | 0 | 826 | 17.85% | Issued | Jul-16 | 0 | 0 | 675 | 14.59% | Issued | Jul-16 | 0 | 0 | 675 | 14.59% | Issued | Jun-16 | 0 | 0 | 583 | 12.60% | Issued | Jun-16 | 0 | 0 | 583 | 12.60% | Issued | May-16 | 0 | 0 | 785 | 16.96% | Issued | Apr-16 | 0 | 0 | 838 | 18.11% | Issued | Feb-16 | 0 | 0 | 1532 | 33.10% | Redeemed | Dec-15 | 0 | 0 | 1941 | 41.94% | Redeemed | Nov-15 | 0 | 0 | 1703 | 36.80% | Redeemed | Oct-15 | 0 | 0 | 716 | 15.47% | Redeemed | Sep-15 | 0 | 0 | 779 | 16.83% | Redeemed | Aug-15 | 0 | 0 | 705 | 15.23% | Redeemed | Jul-15 | 935 | 0 | 935 | 20.20% | Redeemed | Jun-15 | 850 | 0 | 850 | 18.37% | Redeemed | May-15 | 1122 | 0 | 1121 | 24.22% | Redeemed | Apr-15 | 830 | 0 | 830 | 17.93% | Redeemed | Mar-15 | 1244 | 0 | 1245 | 26.90% | Redeemed | Feb-15 | 1130 | 0 | 1129 | 24.39% | Redeemed | Jan-15 | 1571 | 0 | 1571 | 33.95% | Redeemed | Dec-14 | 1713 | 0 | 1714 | 37.04% | Redeemed | Nov-14 | 824 | 0 | 824 | 17.80% | Redeemed | Oct-14 | 1057 | 0 | 1057 | 22.84% | Redeemed | Sep-14 | 416 | 0 | 416 | 8.99% | Redeemed | Aug-14 | 828 | 0 | 829 | 17.91% | Redeemed | Jul-14 | 565 | 0 | 564 | 12.19% | Redeemed | Jun-14 | 431 | 0 | 431 | 9.31% | Redeemed | May-14 | 838 | 0 | 838 | 18.11% | Redeemed | Apr-14 | 709 | 0 | 709 | 15.32% | Redeemed | Mar-14 | 882 | 0 | 881 | 19.04% | Expired | Feb-14 | 278 | 0 | 278 | 6.01% | Expired | Jan-14 | 1522 | 0 | 1522 | 32.89% | Redeemed | Dec-13 | 1167 | 0 | 1166 | 25.19% | Expired | Nov-13 | 1137 | 0 | 1137 | 24.57% | Expired | Oct-13 | 1286 | 0 | 1286 | 27.79% | Redeemed | Sep-13 | 709 | 0 | 710 | 15.34% | Redeemed | Aug-13 | 643 | 0 | 643 | 13.89% | Redeemed | Jul-13 | 616 | 0 | 616 | 13.31% | Redeemed | Jun-13 | 1036 | 0 | 1035 | 22.36% | Redeemed | May-13 | 1003 | 0 | 1003 | 21.67% | Redeemed | Apr-13 | 1208 | 0 | 1208 | 26.10% | Redeemed | Mar-13 | 1121 | 0 | 3 | 0.06% | Revoked | Feb-13 | 1038 | 0 | 1038 | 22.43% | Redeemed | Jan-13 | 163 | 0 | 163 | 3.52% | Redeemed | | | | 929 | 20.07% | Issued | | | | 1 | 0.02% | Issued | | | | 1347 | 29.11% | Issued | | | | 1504 | 32.50% | Issued | | | | 1 | 0.02% | Issued | | | | 924 | 19.97% | Issued | | | | 1 | 0.02% | Issued | | | | 771 | 16.66% | Issued | | | | 708 | 15.30% | Issued | | | | 1101 | 23.79% | Issued | | | | 1127 | 24.35% | Issued | | | | 670 | 14.48% | Issued | | | | 1 | 0.02% | Issued | | | | 1622 | 35.05% | Issued | | | | 1446 | 31.24% | Issued | | | | 1 | 0.02% | Issued |
|
Capacity: 9.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|