Burgar Hill Wind Farm (Wind , Active) Location in the UK : Scotland, Evie Orkney Type of installation: Wind on/offshore: on Turbines :5 Capacity : 5 MW Approx Date of 1st power generation: March 2013
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
A wind farm has existed at Burgar Hill for many years, having acted as a wind turbine test station since the 1980s. The site was selected in 2001 for two additional turbines by npower renewables, in conjunction with Orkney Sustainable Energy.
NB Clearly 5 turbines on site. The site currently has six turbines, varying in scale from the Nordex N60 1.3MW turbine, to the 2.75MW Neg Micon NM92; tip heights vary from 76m to 116m. The site has been designed by Orkney Sustainable Energy to take advantage of the rolling nature of the landscape, and by positioning the largest turbines off the highest ground and placing the smallest turbines on the exposed hilltops, the site layout appears well balanced.
Model: |
Nordex N80
|
Start Speed: |
4
|
Capacity: |
2.5
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
150
|
Web Page: |
http://vetropark.org/d/59743/d/nordex_n80-n90_gb.pdf |
Comment: |
N80 suits High Wind Areas
|
Burgar HillEvieOrkney KW17 2PJ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Burgar Hill (land Near), Evie 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Orkney Islands Country: Scotland LPA: Orkney Islands Council
|
Site ID and Reference: |
3408 / AA001
District:
|
Applicant: |
Application :
07/422/PPF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
2.5 |
Site Address: |
Evie, Orkney
|
|
|
County: |
Orkney Islands Region: Scotland
|
OS Coordinates: |
334300 / 334300
|
Development Status: |
Operational
|
Application Submitted: |
7/9/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
11/1/2009
|
This Record Last Updated: |
5/21/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Burgar Hill 5 MW
|
Energy Type: |
Wind Onshore |
County: |
Orkney Islands Country: Scotland LPA: Orkney Islands Council
|
Site ID and Reference: |
3307 / S0034W3
District:
|
Applicant: |
Orkney Sustainable Energy
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
5 |
Site Address: |
Evie, Orkney
|
|
|
County: |
Orkney Islands Region: Scotland
|
OS Coordinates: |
334300 / 334300
|
Development Status: |
Operational
|
Application Submitted: |
2/13/1997
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/2006
|
This Record Last Updated: |
10/5/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Burgar Hill Wind Farm - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01047NWSC
|
Capacity: |
5000
|
Status: |
Live
|
Accreditation Date: |
2/13/1997
|
|
|
Commission Date: |
12/1/2006
|
|
|
Applicant: |
Innogy Renewables UK Limited (Wind)
|
Applicant Address: |
Windmill Hill Business Park
Whitehill Way
Swindon
SN5 6PB
England
|
Address: |
Burgar Hill Wind Farm (31.10.2006)
Burgar HillEvieOrkney
KW17 2PJ
Scotland
|
|
Assumptions: Capacity: 5000kW 5 MW, Thus over the month Capacity * 720 hours per month = 3600 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 1986 | 39.72% | Issued | 01/02/2018 | | | 1922 | 38.44% | Issued | 01/01/2018 | | | 1701 | 34.02% | Issued | 01/12/2017 | | | 1415 | 28.30% | Issued | 01/11/2017 | | | 2015 | 40.30% | Issued | 01/10/2017 | | | 1551 | 31.02% | Issued | 01/09/2017 | | | 1517 | 30.34% | Issued | 01/08/2017 | | | 1302 | 26.04% | Issued | 01/07/2017 | | | 1137 | 22.74% | Issued | 01/06/2017 | | | 1483 | 29.66% | Issued | 01/05/2017 | | | 1438 | 28.76% | Issued | 01/04/2017 | | | 1946 | 38.92% | Issued | 01/03/2017 | | | 1900 | 38.00% | Redeemed | 01/02/2017 | | | 1281 | 25.62% | Redeemed | 01/01/2017 | | | 1190 | 23.80% | Redeemed | Dec-16 | 0 | 1989 | 1989 | 39.78% | Issued | Nov-16 | 0 | 1809 | 1809 | 36.18% | Issued | Oct-16 | 0 | 1244 | 1244 | 24.88% | Issued | Sep-16 | 0 | 1107 | 1107 | 22.14% | Issued | Aug-16 | 0 | 1162 | 1162 | 23.24% | Issued | Jul-16 | 0 | 1155 | 1155 | 23.10% | Issued | Jun-16 | 0 | 1190 | 1190 | 23.80% | Issued | Jun-16 | 0 | 1190 | 1190 | 23.80% | Issued | May-16 | 0 | 1322 | 1322 | 26.44% | Issued | Apr-16 | 0 | 1689 | 1689 | 33.78% | Issued | Mar-16 | 0 | 1433 | 1433 | 28.66% | Redeemed | Feb-16 | 0 | 1105 | 1105 | 22.10% | Redeemed | Jan-16 | 0 | 2061 | 2061 | 41.22% | Redeemed | Dec-15 | 0 | 1376 | 1376 | 27.52% | Retired | Nov-15 | 0 | 2054 | 2054 | 41.08% | Retired | Oct-15 | 0 | 1829 | 1829 | 36.58% | Retired | Sep-15 | 0 | 1383 | 1383 | 27.66% | Retired | Aug-15 | 0 | 1287 | 1287 | 25.74% | Retired | Jul-15 | 775 | 775 | 775 | 15.50% | Redeemed | Jun-15 | 1044 | 1044 | 1044 | 20.88% | Redeemed | May-15 | 240 | 234 | 240 | 4.80% | Redeemed | Apr-15 | 894 | 895 | 895 | 17.90% | Redeemed | Mar-15 | 1131 | 1131 | 1131 | 22.62% | Expired | Feb-15 | 1298 | 1298 | 1298 | 25.96% | Redeemed | Jan-15 | 1107 | 1107 | 1107 | 22.14% | Redeemed | Dec-14 | 2081 | 2081 | 2081 | 41.62% | Redeemed | Nov-14 | 1699 | 1699 | 1699 | 33.98% | Redeemed | Oct-14 | 1944 | 1944 | 1944 | 38.88% | Redeemed | Sep-14 | 1045 | 1045 | 1045 | 20.90% | Redeemed | Aug-14 | 1466 | 1466 | 1466 | 29.32% | Redeemed | Jul-14 | 1097 | 1096 | 1096 | 21.92% | Redeemed | Jun-14 | 611 | 612 | 612 | 12.24% | Redeemed | May-14 | 527 | 527 | 527 | 10.54% | Redeemed | Apr-14 | 1765 | 1764 | 1764 | 35.28% | Redeemed | Mar-14 | 2032 | 2032 | 2032 | 40.64% | Expired | Feb-14 | 2388 | 2388 | 2388 | 47.76% | Expired | Jan-14 | 2700 | 2700 | 2700 | 54.00% | Expired | Dec-13 | 2492 | 2491 | 2491 | 49.82% | Expired | Nov-13 | 2351 | 2351 | 2351 | 47.02% | Expired | Oct-13 | 1535 | 1535 | 1535 | 30.70% | Expired | Sep-13 | 1576 | 1576 | 1576 | 31.52% | Expired | Aug-13 | 1336 | 1336 | 1336 | 26.72% | Expired | Jul-13 | 1845 | 1844 | 1844 | 36.88% | Expired | Jun-13 | 1113 | 1113 | 1113 | 22.26% | Expired | May-13 | 1564 | 1564 | 1564 | 31.28% | Expired | Apr-13 | 1716 | 1716 | 1716 | 34.32% | Expired | Mar-13 | 1496 | 1496 | 1496 | 29.92% | Redeemed | Feb-13 | 1625 | 1626 | 1626 | 32.52% | Redeemed | Jan-13 | 2069 | 2068 | 2068 | 41.36% | Redeemed | Dec-12 | 1680 | 1680 | 1680 | 33.60% | Redeemed | Nov-12 | 1950 | 1950 | 1950 | 39.00% | Redeemed | Oct-12 | 1551 | 1551 | 1551 | 31.02% | Redeemed | Sep-12 | 2380 | 2380 | 2380 | 47.60% | Redeemed | Aug-12 | 1170 | 1169 | 1169 | 23.38% | Redeemed | Jul-12 | 1150 | 1151 | 1151 | 23.02% | Redeemed | Jun-12 | 884 | 884 | 884 | 17.68% | Redeemed | May-12 | 1154 | 1154 | 1154 | 23.08% | Redeemed | Apr-12 | 1447 | 1447 | 1447 | 28.94% | Redeemed | Mar-12 | 2383 | 2384 | 2384 | 47.68% | Expired | Feb-12 | 2187 | 2187 | 2187 | 43.74% | Expired | Jan-12 | 2156 | 2156 | 2156 | 43.12% | Expired | Dec-11 | 969 | 969 | 969 | 19.38% | Redeemed | Nov-11 | 1991 | 1991 | 1991 | 39.82% | Redeemed | Oct-11 | 2362 | 2361 | 2361 | 47.22% | Redeemed | Sep-11 | 1816 | 1816 | 1816 | 36.32% | Redeemed | Aug-11 | 1110 | 1110 | 1110 | 22.20% | Redeemed | Jul-11 | 1133 | 1133 | 1133 | 22.66% | Redeemed | Jun-11 | 846 | 846 | 846 | 16.92% | Redeemed | May-11 | 2043 | 2044 | 2044 | 40.88% | Redeemed | Apr-11 | 1320 | 1319 | 1319 | 26.38% | Redeemed | Mar-11 | 1905 | 1905 | 1905 | 38.10% | Redeemed | Feb-11 | 1655 | 1656 | 1656 | 33.12% | Redeemed | Jan-11 | 1689 | 1688 | 1688 | 33.76% | Redeemed | Dec-10 | 1538 | 1539 | 1539 | 30.78% | Redeemed | Nov-10 | 1687 | 1686 | 1686 | 33.72% | Redeemed |
|
Capacity: 12.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|