Loading
Page views this IP this session = 8 of 10 unsubscribed pagesLissett Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Lissett Wind Farm (Wind , Active) Location in the UK : England, East Riding of Yorkshire Type of installation: Wind on/offshore: on Turbines :12 Capacity : 30 MW Approx Date of 1st power generation: February 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Novera received planning approval to build a wind farm on the former RAF Airfield near Lissett, south of Bridlington in February 2007 followed by full planning consent in July. When fully operational, Lissett is expected to produce approximately 74.5 gigawatt-hours (GWh) per year. Construction commenced in December 2007 Power production started in February 2009.
Now owned by Infinis
Model: |
Nordex N90
|
Start Speed: |
4
|
Capacity: |
2.3
|
Optimal Speed: |
12
|
Rotor Diameter: |
90
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:80
|
Avg. Elevation: |
4
|
Web Page: |
http://www.nordex-online.com/en/produkte-service/wind-turbines/n90-25-mw.html |
Comment: |
N90 suits inland locations
|
Lissett Lane (A165)Lissett YO25 8PZ England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Lissett Airfield Wind Farm Extension 12.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: East Riding of Yorkshire Council
|
Site ID and Reference: |
4298 / C0781
District:
|
Applicant: |
Energiekontor UK
Application :
13/03625/STPLFE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
12.5 |
Site Address: |
North Pasture Farm Out Gates Gembling East Riding Of Yorkshire YO25 8HS
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
512204 / 512204
|
Development Status: |
Appeal Withdrawn
|
Application Submitted: |
10/30/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
8/6/2015
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/4/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
10/20/2015 |
Called In: |
|
Appeal Withdrawn: |
12/22/2015 |
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
8/6/2015 |
Site Name: |
Lissett Airfield Wind Farm 30 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: East Riding of Yorkshire Council
|
Site ID and Reference: |
3539 / EN00161
District:
|
Applicant: |
Novera Energy
Application :
06/05618/STPLFE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
12 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
30 |
Site Address: |
1.5km west of Lisset, East Yorkshire
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
512263 / 512263
|
Development Status: |
Operational
|
Application Submitted: |
7/10/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/20/2009
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Lissett Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00211RQEN
|
Capacity: |
29950
|
Status: |
Live
|
Accreditation Date: |
7/10/2006
|
|
|
Commission Date: |
12/22/2008
|
|
|
Applicant: |
Lissett Airfield Windfarm Limited
|
Applicant Address: |
Lissett Airfield Windfarm Limited
500 Pavilion Drive
NORTHAMPTON
NN4 7YJ
England
|
Address: |
Lissett Lane (A165)
Lissett
YO25 8PZ
England
|
Site Name: |
Lissett Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01519NWEN
|
Capacity: |
29950
|
Status: |
Live
|
Accreditation Date: |
7/10/2006
|
|
|
Commission Date: |
12/22/2008
|
|
|
Applicant: |
Lissett Airfield Windfarm Limited
|
Applicant Address: |
Lissett Airfield Windfarm Limited
500 Pavilion Drive
NORTHAMPTON
NN4 7YJ
England
|
Address: |
Lissett Lane (A165)
Lissett
YO25 8PZ
England
|
|
Assumptions: Capacity: 29950kW 29.95 MW, Thus over the month Capacity * 720 hours per month = 21564 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 5606 | 18.72% | Issued | 01/03/2018 | | | 8380 | 27.98% | Issued | 01/02/2018 | | | 7149 | 23.87% | Issued | 01/01/2018 | | | 9351 | 31.22% | Issued | 01/12/2017 | | | 7844 | 26.19% | Issued | 01/11/2017 | | | 6897 | 23.03% | Issued | 01/10/2017 | | | 8943 | 29.86% | Issued | 01/09/2017 | | | 4413 | 14.73% | Issued | 01/08/2017 | | | 4393 | 14.67% | Issued | 01/07/2017 | | | 3687 | 12.31% | Issued | 01/06/2017 | | | 5600 | 18.70% | Issued | 01/05/2017 | | | 4951 | 16.53% | Issued | 01/04/2017 | | | 4937 | 16.48% | Issued | 01/03/2017 | | | 6228 | 20.79% | Redeemed | 01/02/2017 | | | 7455 | 24.89% | Redeemed | 01/01/2017 | | | 4961 | 16.56% | Redeemed | Dec-16 | 0 | 5515 | 5515 | 18.41% | Issued | Nov-16 | 0 | 5372 | 5372 | 17.94% | Issued | Oct-16 | 0 | 5422 | 5422 | 18.10% | Issued | Sep-16 | 0 | 4973 | 4973 | 16.60% | Issued | Aug-16 | 0 | 5188 | 5188 | 17.32% | Issued | Jul-16 | 0 | 3987 | 3987 | 13.31% | Issued | Jul-16 | 0 | 3987 | 3987 | 13.31% | Issued | Jun-16 | 0 | 2796 | 2816 | 9.40% | Issued | Jun-16 | 0 | 2796 | 2816 | 9.40% | Issued | May-16 | 0 | 5467 | 5467 | 18.25% | Issued | Apr-16 | 0 | 4929 | 4929 | 16.46% | Issued | Mar-16 | 0 | 5231 | 5231 | 17.47% | Redeemed | Feb-16 | 0 | 8096 | 8096 | 27.03% | Redeemed | Jan-16 | 0 | 9405 | 9405 | 31.40% | Redeemed | Dec-15 | 0 | 12282 | 12282 | 41.01% | Redeemed | Nov-15 | 0 | 10087 | 10087 | 33.68% | Redeemed | Oct-15 | 0 | 3909 | 3909 | 13.05% | Redeemed | Sep-15 | 0 | 2826 | 2826 | 9.44% | Redeemed | Aug-15 | 0 | 4206 | 4206 | 14.04% | Redeemed | Jul-15 | 2775 | 2775 | 2775 | 9.27% | Redeemed | Jun-15 | 4376 | 4376 | 4376 | 14.61% | Redeemed | May-15 | 7228 | 7228 | 7228 | 24.13% | Redeemed | Apr-15 | 4455 | 4454 | 4454 | 14.87% | Redeemed | Mar-15 | 8950 | 8950 | 8950 | 29.88% | Redeemed | Feb-15 | 4956 | 4956 | 4956 | 16.55% | Redeemed | Jan-15 | 10849 | 10849 | 10849 | 36.22% | Redeemed | Dec-14 | 9333 | 9333 | 9333 | 31.16% | Redeemed | Nov-14 | 5515 | 5515 | 5515 | 18.41% | Redeemed | Oct-14 | 8543 | 8543 | 8543 | 28.52% | Redeemed | Sep-14 | 1482 | 1462 | 1481 | 4.94% | Redeemed | Aug-14 | 5580 | 5580 | 5580 | 18.63% | Redeemed | Jul-14 | 2857 | 2843 | 2857 | 9.54% | Redeemed | Jun-14 | 1839 | 1819 | 1838 | 6.14% | Redeemed | May-14 | 3933 | 3933 | 3933 | 13.13% | Redeemed | Apr-14 | 5172 | 5172 | 5172 | 17.27% | Redeemed | Mar-14 | 7900 | 7901 | 7901 | 26.38% | Redeemed | Feb-14 | 11668 | 11668 | 11668 | 38.96% | Redeemed | Jan-14 | 8813 | 8813 | 8812 | 29.42% | Redeemed | Dec-13 | 11479 | 11478 | 11478 | 38.32% | Redeemed | Nov-13 | 5808 | 5808 | 5808 | 19.39% | Redeemed | Oct-13 | 10830 | 10830 | 10830 | 36.16% | Redeemed | Sep-13 | 4943 | 4943 | 4943 | 16.50% | Redeemed | Aug-13 | 4363 | 4363 | 4363 | 14.57% | Redeemed | Jul-13 | 2074 | 2057 | 2074 | 6.92% | Redeemed | Jun-13 | 3088 | 3088 | 3088 | 10.31% | Redeemed | May-13 | 6135 | 6135 | 6135 | 20.48% | Redeemed | Apr-13 | 8094 | 8094 | 8094 | 27.03% | Redeemed | Mar-13 | 8427 | 8427 | 8427 | 28.14% | Redeemed | Feb-13 | 6500 | 6500 | 6500 | 21.70% | Redeemed | Jan-13 | 7801 | 7801 | 7801 | 26.05% | Redeemed | Dec-12 | 8767 | 8767 | 8767 | 29.27% | Redeemed | Nov-12 | 7147 | 7147 | 7147 | 23.86% | Redeemed | Oct-12 | 5839 | 5840 | 5840 | 19.50% | Redeemed | Sep-12 | 6876 | 6876 | 6876 | 22.96% | Redeemed | Aug-12 | 3710 | 3710 | 3710 | 12.39% | Redeemed | Jul-12 | 3421 | 3421 | 3421 | 11.42% | Redeemed | Jun-12 | 5281 | 5281 | 5281 | 17.63% | Redeemed | May-12 | 4803 | 4802 | 4802 | 16.03% | Redeemed | Apr-12 | 5213 | 5213 | 5213 | 17.41% | Redeemed | Mar-12 | 3945 | 3944 | 3944 | 13.17% | Redeemed | Feb-12 | 6610 | 6611 | 6611 | 22.07% | Redeemed | Jan-12 | 8965 | 8965 | 8965 | 29.93% | Redeemed | Dec-11 | 11626 | 11626 | 11626 | 38.82% | Redeemed | Nov-11 | 6508 | 6508 | 6508 | 21.73% | Redeemed | Oct-11 | 7886 | 7886 | 7886 | 26.33% | Redeemed | Sep-11 | 7166 | 7166 | 7166 | 23.93% | Redeemed | Aug-11 | 3694 | 3694 | 3694 | 12.33% | Redeemed | Jul-11 | 3315 | 3315 | 3315 | 11.07% | Redeemed | Jun-11 | 3208 | 3208 | 3208 | 10.71% | Redeemed | May-11 | 7780 | 7780 | 7780 | 25.98% | Redeemed | Apr-11 | 4985 | 4985 | 4985 | 16.64% | Redeemed | Mar-11 | 3717 | 3717 | 3717 | 12.41% | Redeemed | Feb-11 | 6426 | 6426 | 6426 | 21.46% | Redeemed | Jan-11 | 7055 | 7055 | 7055 | 23.56% | Redeemed | Dec-10 | 5192 | 5192 | 5192 | 17.34% | Expired | Nov-10 | 8496 | 8496 | 8496 | 28.37% | Expired |
|
Capacity: 60 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|