Loading
Page views this IP this session = 4 of 10 unsubscribed pagesManton Wood Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Manton Wood Wind Farm (Wind , Active) Location in the UK : England, Nottinghamshire, Worksop Type of installation: Wind on/offshore: on Turbines :1 Capacity : 2 MW Approx Date of 1st power generation: January 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The turbine will be situated within the grounds of the B&Q Manton Wood Distribution Centre, Worksop.
The B&Q wind turbine will be a single turbine generating approximately 5075 MWh/yr1.
The turbine will offset an estimated 5049 tonnes of carbon dioxide per year2.
The turbine will repay the ‘carbon debt’ (i.e. the energy used during their life cycle - from production to maintenance
and decommissioning) in approximately 3-6 months.
The turbine will provide enough energy equivalent of up to 1538 homes3.
Model: |
Enercon E82
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
82
|
Stop Speed: |
31
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
0
|
Web Page: |
http://www.enercon.de/en-en/62.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
B&Q Manton Wood Distribution Centre Relford Road Manton Worksop S80 2PU England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Worksop - B&Q 2 MW
|
Energy Type: |
Wind Onshore |
County: |
Nottinghamshire Country: England LPA: Bassetlaw District Council
|
Site ID and Reference: |
3510 / EN00634
District:
|
Applicant: |
Ecotricity
Application :
1/2/07/528
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
2 |
Site Address: |
Manton Wood, Worksop, Nottinghamshire
|
|
|
County: |
Nottinghamshire Region: East Midlands
|
OS Coordinates: |
461695 / 461695
|
Development Status: |
Operational
|
Application Submitted: |
9/7/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
12/1/2008
|
|
|
Generator Live |
1/21/2009
|
This Record Last Updated: |
5/8/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Worksop Wind Park Ltd
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00206RQEN
|
Capacity: |
2000
|
Status: |
Live
|
Accreditation Date: |
9/7/2007
|
|
|
Commission Date: |
1/21/2009
|
|
|
Applicant: |
Ecotricity Group Ltd
|
Applicant Address: |
Ecotricity
Lion House
Rowcroft
Stroud
GL5 3BY
England
|
Address: |
B&Q Manton Wood Distribution Centre
Relford Road
Manton
Worksop
S80 2PU
England
|
Site Name: |
Worksop Wind Park Ltd
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01504NWEN
|
Capacity: |
2000
|
Status: |
Live
|
Accreditation Date: |
9/7/2007
|
|
|
Commission Date: |
1/21/2009
|
|
|
Applicant: |
Ecotricity Group Ltd
|
Applicant Address: |
Ecotricity
Lion House
Rowcroft
Stroud
GL5 3BY
England
|
Address: |
B&Q Manton Wood Distribution Centre
Relford Road
Manton
Worksop
S80 2PU
England
|
|
Assumptions: Capacity: 2000kW 2 MW, Thus over the month Capacity * 720 hours per month = 1440 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 201 | 10.05% | Issued | 01/04/2018 | | | 239 | 11.95% | Issued | 01/03/2018 | | | 371 | 18.55% | Issued | 01/02/2018 | | | 337 | 16.85% | Issued | 01/01/2018 | | | 490 | 24.50% | Issued | 01/12/2017 | | | 450 | 22.50% | Issued | 01/11/2017 | | | 381 | 19.05% | Issued | 01/10/2017 | | | 446 | 22.30% | Issued | 01/09/2017 | | | 248 | 12.40% | Issued | 01/08/2017 | | | 243 | 12.15% | Issued | 01/07/2017 | | | 218 | 10.90% | Issued | 01/06/2017 | | | 317 | 15.85% | Issued | 01/05/2017 | | | 256 | 12.80% | Issued | 01/04/2017 | | | 265 | 13.25% | Issued | 01/03/2017 | | | 313 | 15.65% | Redeemed | 01/02/2017 | | | 350 | 17.50% | Redeemed | 01/01/2017 | | | 283 | 14.15% | Redeemed | Dec-16 | 0 | 330 | 330 | 16.50% | Issued | Nov-16 | 0 | 276 | 276 | 13.80% | Issued | Oct-16 | 0 | 147 | 148 | 7.40% | Issued | Oct-16 | 0 | 0 | 148 | 7.40% | Issued | Sep-16 | 0 | 253 | 253 | 12.65% | Issued | Aug-16 | 0 | 265 | 265 | 13.25% | Issued | Jul-16 | 0 | 227 | 227 | 11.35% | Issued | Jul-16 | 0 | 227 | 227 | 11.35% | Issued | Jun-16 | 0 | 148 | 148 | 7.40% | Issued | May-16 | 0 | 272 | 272 | 13.60% | Issued | Apr-16 | 0 | 250 | 250 | 12.50% | Issued | Mar-16 | 0 | 316 | 316 | 15.80% | Redeemed | Feb-16 | 0 | 454 | 454 | 22.70% | Redeemed | Jan-16 | 0 | 468 | 468 | 23.40% | Redeemed | Dec-15 | 0 | 671 | 671 | 33.55% | Redeemed | Nov-15 | 0 | 566 | 566 | 28.30% | Redeemed | Oct-15 | 0 | 192 | 192 | 9.60% | Redeemed | Sep-15 | 0 | 129 | 129 | 6.45% | Redeemed | Aug-15 | 0 | 234 | 234 | 11.70% | Redeemed | Jul-15 | 227 | 227 | 227 | 11.35% | Redeemed | Jun-15 | 228 | 229 | 229 | 11.45% | Redeemed | May-15 | 390 | 389 | 389 | 19.45% | Redeemed | Apr-15 | 248 | 248 | 248 | 12.40% | Redeemed | Mar-15 | 502 | 502 | 502 | 25.10% | Redeemed | Feb-15 | 350 | 350 | 350 | 17.50% | Redeemed | Jan-15 | 625 | 624 | 624 | 31.20% | Redeemed | Dec-14 | 585 | 585 | 585 | 29.25% | Redeemed | Nov-14 | 237 | 237 | 237 | 11.85% | Redeemed | Oct-14 | 433 | 433 | 433 | 21.65% | Redeemed | Sep-14 | 78 | 77 | 78 | 3.90% | Redeemed | Aug-14 | 312 | 312 | 312 | 15.60% | Redeemed | Jul-14 | 178 | 178 | 178 | 8.90% | Redeemed | Jun-14 | 98 | 98 | 98 | 4.90% | Redeemed | May-14 | 223 | 223 | 223 | 11.15% | Redeemed | Apr-14 | 155 | 155 | 155 | 7.75% | Redeemed | Mar-14 | 105 | 103 | 104 | 5.20% | Redeemed | Feb-14 | 512 | 513 | 512 | 25.60% | Redeemed | Jan-14 | 491 | 490 | 490 | 24.50% | Redeemed | Dec-13 | 587 | 587 | 587 | 29.35% | Redeemed | Nov-13 | 167 | 166 | 167 | 8.35% | Redeemed | Oct-13 | 468 | 468 | 468 | 23.40% | Redeemed | Sep-13 | 211 | 211 | 211 | 10.55% | Redeemed | Aug-13 | 247 | 247 | 247 | 12.35% | Redeemed | Jul-13 | 126 | 125 | 125 | 6.25% | Redeemed | Jun-13 | 209 | 210 | 210 | 10.50% | Redeemed | May-13 | 308 | 307 | 307 | 15.35% | Redeemed | Apr-13 | 420 | 420 | 420 | 21.00% | Redeemed | Mar-13 | 325 | 325 | 325 | 16.25% | Redeemed | Feb-13 | 305 | 305 | 3 | 0.15% | Revoked | Jan-13 | 357 | 357 | 3 | 0.15% | Revoked | Dec-12 | 474 | 474 | 5 | 0.25% | Revoked | Nov-12 | 337 | 337 | 3 | 0.15% | Revoked | Oct-12 | 253 | 253 | 4 | 0.20% | Revoked | Sep-12 | 305 | 305 | 3 | 0.15% | Revoked | Aug-12 | 197 | 196 | 2 | 0.10% | Revoked | Jul-12 | 184 | 185 | 1 | 0.05% | Revoked | Jun-12 | 313 | 312 | 293 | 14.65% | Redeemed | May-12 | 236 | 237 | 2 | 0.10% | Revoked | Apr-12 | 267 | 267 | 2 | 0.10% | Revoked | Mar-12 | 209 | 210 | 104 | 5.20% | Redeemed | Feb-12 | 307 | 307 | 148 | 7.40% | Redeemed | Jan-12 | 497 | 496 | 419 | 20.95% | Redeemed | Dec-11 | 697 | 698 | 698 | 34.90% | Redeemed | Nov-11 | 336 | 336 | 336 | 16.80% | Redeemed | Oct-11 | 429 | 429 | 429 | 21.45% | Redeemed | Sep-11 | 372 | 372 | 372 | 18.60% | Redeemed | Aug-11 | 229 | 229 | 229 | 11.45% | Redeemed | Jul-11 | 184 | 183 | 183 | 9.15% | Redeemed | Jun-11 | 235 | 235 | 235 | 11.75% | Redeemed | May-11 | 417 | 418 | 418 | 20.90% | Redeemed | Apr-11 | 274 | 273 | 273 | 13.65% | Redeemed | Mar-11 | 193 | 194 | 194 | 9.70% | Redeemed | Feb-11 | 252 | 251 | 251 | 12.55% | Redeemed | Jan-11 | 340 | 340 | 340 | 17.00% | Redeemed | Dec-10 | 221 | 222 | 222 | 11.10% | Redeemed |
|
Capacity: 4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017