Seamer Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Seamer Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Middlesborough    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 10.25 MW
Approx Date of 1st power generation: November 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

These turbines typically have a tower height of between 60 and 80 metres with a rotor diameter of around 80 to 90 metres, giving a total tip height of between 100 and 125 metres.
Planning approval for the full scheme was received in June 2010. Construction commenced in September 2011 and the wind farm became fully operational in November 2012.
acquired by Infinis in May 2012

 Turbine Make and Specs

Model: Senvion MM92 Start Speed: 4
Capacity: 2 Optimal Speed: 12
Rotor Diameter: 92 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 72
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.

 Address

North Side of Seamer - Hilton RoadNr. Seamer TS15 9JX England

 Associated Companies.

Relationship Company (For: Seamer )
DeveloperBroadview Energy
Operatorinfinis
Ownerinfinis
ContractorPNE WIND (Brookfield)

 DECC Data on this Project: Seamer :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Seamer Wind Farm - Hambleton     4 MW
Energy Type: Wind Onshore
County: Cleveland     Country: England     LPA: Hambleton District Council
Site ID and Reference: 3791 / AA214     District:
Applicant: Infinis, previously Broadview Energy     Application : 09/00859/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 4
Site Address: Land Adjacent Hilton Road, Seamer, Middlesbrough
 
County: Cleveland Region: North East
OS Coordinates: 447872 / 447872
Development Status: Operational
Application Submitted: 3/27/2009 Planning Permission Granted
Application Determined: Permission refused: 9/18/2009
Construction Date: 10/1/2011    
Generator Live 11/1/2012 This Record Last Updated: 11/29/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 9/18/2009

Site Name: Seamer Windfarm - Stockton on Tees     6 MW
Energy Type: Wind Onshore
County: County Durham     Country: England     LPA: Stockton on Tees Borough Council
Site ID and Reference: 3984 / EN00570     District:
Applicant: Broadview Energy     Application : 09/0736/EIS (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 6
Site Address: Between the villages of Hilton and Seamer on the Stockton-on-Tees and North Yorkshire boundaries.
 
County: County Durham Region: North East
OS Coordinates: 448125 / 448125
Development Status: Operational
Application Submitted: 3/27/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/1/2012    
Generator Live 11/1/2012 This Record Last Updated: 11/29/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Seamer: Wind :

Site Name: Seamer Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00282RQEN
Capacity: 10200 Status: Live
Accreditation Date: 3/27/2009    
Commission Date: 6/20/2012    
Applicant: Seamer Wind Farm Ltd
Applicant Address: Infinis Wind Services Ltd 50 Fredrick Street Edinburgh EH2 1EX Scotland
Address: North Side of Seamer - Hilton Road Nr. Seamer TS15 9JX England

Site Name: Seamer Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01982NWEN
Capacity: 10200 Status: Live
Accreditation Date: 3/27/2009    
Commission Date: 6/20/2012    
Applicant: Seamer Wind Farm Ltd
Applicant Address: Infinis Wind Services Ltd 50 Fredrick Street Edinburgh EH2 1EX Scotland
Address: North Side of Seamer - Hilton Road Nr. Seamer TS15 9JX England
 
Assumptions: Capacity: 10200kW 10.2 MW,
Thus over the month Capacity * 720 hours per month = 7344 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 2415 23.68% Issued
01/03/2018 3064 30.04% Issued
01/02/2018 2576 25.25% Issued
01/01/2018 3270 32.06% Issued
01/12/2017 3067 30.07% Issued
01/11/2017 3014 29.55% Issued
01/10/2017 3059 29.99% Issued
01/09/2017 1845 18.09% Issued
01/08/2017 2297 22.52% Issued
01/07/2017 1888 18.51% Issued
01/06/2017 2174 21.31% Issued
01/05/2017 1982 19.43% Issued
01/04/2017 2116 20.75% Issued
01/04/2017 9 0.09% Issued
01/04/2017 6 0.06% Issued
01/03/2017 2724 26.71% Redeemed
01/02/2017 3088 30.27% Redeemed
01/01/2017 2573 25.23% Redeemed
Dec-16 03073 3073 30.13% Issued
Nov-16 01844 1844 18.08% Issued
Oct-16 01700 1700 16.67% Issued
Sep-16 02387 2387 23.40% Issued
Aug-16 02046 2046 20.06% Issued
Jul-16 01598 1598 15.67% Issued
Jul-16 01598 1598 15.67% Issued
Jun-16 01243 1254 12.29% Issued
Jun-16 01243 1254 12.29% Issued
May-16 02421 2421 23.74% Issued
Apr-16 02070 2070 20.29% Issued
Mar-16 02390 2390 23.43% Redeemed
Feb-16 02883 2883 28.26% Redeemed
Jan-16 03450 3450 33.82% Redeemed
Dec-15 04724 4724 46.31% Redeemed
Nov-15 03900 3900 38.24% Redeemed
Oct-15 01696 1709 16.75% Redeemed
Sep-15 01148 1159 11.36% Redeemed
Aug-15 02292 2292 22.47% Redeemed
Jul-15 17441734 1744 17.10% Redeemed
Jun-15 20212021 2021 19.81% Redeemed
May-15 28512850 2850 27.94% Redeemed
Apr-15 21032091 2103 20.62% Redeemed
Mar-15 36663666 3666 35.94% Redeemed
Feb-15 26232623 2623 25.72% Redeemed
Jan-15 42864285 4285 42.01% Redeemed
Dec-14 31673167 3167 31.05% Redeemed
Nov-14 23242324 2324 22.78% Redeemed
Oct-14 37763777 3777 37.03% Redeemed
Sep-14 817803 816 8.00% Redeemed
Aug-14 23682369 2369 23.23% Redeemed
Jul-14 13601352 1359 13.32% Redeemed
Jun-14 751742 752 7.37% Redeemed
May-14 17091699 1709 16.75% Redeemed
Apr-14 20692069 2069 20.28% Redeemed
Mar-14 33223322 3322 32.57% Redeemed
Feb-14 48764877 4877 47.81% Redeemed
Jan-14 39613960 3960 38.82% Redeemed
Dec-13 43674367 4367 42.81% Redeemed
Nov-13 20922092 2092 20.51% Redeemed
Oct-13 39523952 3952 38.75% Redeemed
Sep-13 17211721 1721 16.87% Redeemed
Aug-13 20752075 2075 20.34% Redeemed
Jul-13 11171108 1117 10.95% Redeemed
Jun-13 13651356 1365 13.38% Redeemed
May-13 24402441 2441 23.93% Redeemed
Apr-13 31273126 3126 30.65% Redeemed
Mar-13 25642564 2564 25.14% Redeemed
Feb-13 21492149 2149 21.07% Redeemed
Jan-13 28532853 2853 27.97% Redeemed
Dec-12 34333433 3433 33.66% Redeemed
Nov-12 32643264 3264 32.00% Redeemed
Oct-12 12281227 1227 12.03% Redeemed
Sep-12 60 6 0.06% Redeemed
Aug-12 2215 23 0.23% Redeemed

 Calculations


Capacity: 36.9
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 10/7/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 36.9 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353707

Project Info
SEAMER Wind Farm

Infinis:SEAMER Windfarm

(2008) Border wind farm plans on display
Broadview Energy wants to erect up to five turbines on land between the villages of Hilton and SEAMER.

Controversial wind farm towers over Yarm villages
The five 125-metre wind turbines have been installed between the villages of Hilton and SEAMER and will soon start turning, with the aim of generating power for around 7,000 homes.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School