Page views this IP this session = 1 of 10 unsubscribed pagesFlimby Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Flimby Wind Farm (Wind , Active) Location in the UK : England, Cumbria Type of installation: Wind on/offshore: on Turbines :3 Capacity : 9.5 MW Approx Date of 1st power generation: June 2013
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Details of local community fund: The fund would be linked to the megawatt installed capacity of the project, at £2000 per MW. Based on an installed capacity of 7.5 MW (i.e. 3 x 2.5 MW turbines) this fund would provide some £15,000 each year and over £375,000 over the life of the wind farm. The fund would also be index linked for the lifetime of the wind farm.
Model: |
Senvion MM92
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
12
|
Rotor Diameter: |
92
|
Stop Speed: |
25
|
Hub Height |
67 Avg for all turbines:67
|
Avg. Elevation: |
95
|
Web Page: |
http://www.repower.de/wind-power-solutions/wind-turbines/5m/ |
Comment: |
The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.
|
Flimby Wind Farm Fimby Maryport CA15 8SU England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Land at Flimby Hall Farm 6.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Allerdale Borough Council
|
Site ID and Reference: |
3972 / EN00491b
District:
|
Applicant: |
Flimby Wind Energy Ltd
Application :
2/2009/0418
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
6.15 |
Site Address: |
Flimby, Maryport,
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
302500 / 302500
|
Development Status: |
Operational
|
Application Submitted: |
6/9/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/8/2009
|
Construction Date: |
4/1/2012
|
|
|
Generator Live |
6/14/2013
|
This Record Last Updated: |
6/25/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/8/2009 |
Site Name: |
Land at Flimby Hall Farm 9.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Allerdale Borough Council
|
Site ID and Reference: |
3048 / EN00491
District:
|
Applicant: |
Flimby Wind Energy Ltd
Application :
2/2007/1255
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
3.1600000000000001 |
Height of Turbines: |
|
Calculated capacity: |
9.48 |
Site Address: |
Flimby, Maryport,
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
302500 / 302500
|
Development Status: |
Revised
|
Application Submitted: |
12/5/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/29/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Flimby
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00221RQEN
|
Capacity: |
6090
|
Status: |
Live
|
Accreditation Date: |
12/5/2007
|
|
|
Commission Date: |
2/26/2013
|
|
|
Applicant: |
Flimby Wind Energy Ltd
|
Applicant Address: |
5th Floor
Senator House
85 Queen Victoria Street
London
EC4V 4DP
England
|
Address: |
Flimby Wind Farm
Fimby
Maryport
CA15 8SU
England
|
Site Name: |
Flimby
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02149NWEN
|
Capacity: |
6090
|
Status: |
Live
|
Accreditation Date: |
12/5/2007
|
|
|
Commission Date: |
2/26/2013
|
|
|
Applicant: |
Flimby Wind Energy Ltd
|
Applicant Address: |
5th Floor
Senator House
85 Queen Victoria Street
London
EC4V 4DP
England
|
Address: |
Flimby Wind Farm
Fimby
Maryport
CA15 8SU
England
|
|
Assumptions: Capacity: 6090kW 6.09 MW, Thus over the month Capacity * 720 hours per month = 4384.8 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 1905 | 31.28% | Issued | 01/03/2018 | | | 1923 | 31.58% | Issued | 01/02/2018 | | | 1479 | 24.29% | Issued | 01/01/2018 | | | 2346 | 38.52% | Issued | 01/12/2017 | | | 1977 | 32.46% | Issued | 01/11/2017 | | | 1926 | 31.63% | Issued | 01/10/2017 | | | 2352 | 38.62% | Issued | 01/09/2017 | | | 1511 | 24.81% | Issued | 01/08/2017 | | | 1705 | 28.00% | Issued | 01/07/2017 | | | 1511 | 24.81% | Issued | 01/06/2017 | | | 1924 | 31.59% | Issued | 01/05/2017 | | | 1432 | 23.51% | Issued | 01/04/2017 | | | 2 | 0.03% | Issued | 01/04/2017 | | | 1471 | 24.15% | Issued | 01/03/2017 | | | 1939 | 31.84% | Redeemed | 01/02/2017 | | | 2076 | 34.09% | Redeemed | 01/01/2017 | | | 1569 | 25.76% | Redeemed | Dec-16 | 0 | 2102 | 2102 | 34.52% | Issued | Nov-16 | 0 | 1424 | 1424 | 23.38% | Issued | Oct-16 | 0 | 1059 | 1059 | 17.39% | Issued | Sep-16 | 0 | 2067 | 2067 | 33.94% | Issued | Aug-16 | 0 | 1119 | 1119 | 18.37% | Issued | Jul-16 | 0 | 1050 | 1050 | 17.24% | Issued | Jul-16 | 0 | 1050 | 1050 | 17.24% | Issued | Jun-16 | 0 | 611 | 611 | 10.03% | Issued | May-16 | 0 | 1255 | 1255 | 20.61% | Issued | Mar-16 | 0 | 1482 | 1482 | 24.33% | Redeemed | Feb-16 | 0 | 1952 | 1952 | 32.05% | Redeemed | Jan-16 | 0 | 2032 | 2032 | 33.37% | Redeemed | Dec-15 | 0 | 2631 | 2631 | 43.20% | Redeemed | Nov-15 | 0 | 2371 | 2371 | 38.93% | Redeemed | Oct-15 | 0 | 1109 | 1109 | 18.21% | Redeemed | Sep-15 | 0 | 777 | 777 | 12.76% | Redeemed | Aug-15 | 0 | 1651 | 1651 | 27.11% | Redeemed | Jul-15 | 1623 | 1623 | 1623 | 26.65% | Redeemed | Jun-15 | 1516 | 1516 | 1516 | 24.89% | Redeemed | May-15 | 2220 | 2220 | 2220 | 36.45% | Redeemed | Apr-15 | 1352 | 1352 | 1352 | 22.20% | Redeemed | Mar-15 | 2077 | 2077 | 2077 | 34.11% | Redeemed | Feb-15 | 1708 | 1708 | 1708 | 28.05% | Redeemed | Jan-15 | 2834 | 2834 | 2834 | 46.54% | Redeemed | Dec-14 | 2489 | 2489 | 2489 | 40.87% | Redeemed | Nov-14 | 1304 | 1304 | 1304 | 21.41% | Redeemed | Oct-14 | 2393 | 2392 | 2392 | 39.28% | Redeemed | Sep-14 | 601 | 601 | 601 | 9.87% | Redeemed | Aug-14 | 1766 | 1766 | 1766 | 29.00% | Redeemed | Jul-14 | 955 | 955 | 955 | 15.68% | Redeemed | Jun-14 | 549 | 550 | 550 | 9.03% | Redeemed | May-14 | 1033 | 1033 | 1033 | 16.96% | Redeemed | Apr-14 | 1519 | 1519 | 1519 | 24.94% | Redeemed | Mar-14 | 2171 | 2171 | 2171 | 35.65% | Redeemed | Feb-14 | 2815 | 2815 | 2815 | 46.22% | Redeemed | Jan-14 | 2196 | 2196 | 2196 | 36.06% | Redeemed | Dec-13 | 2907 | 2907 | 2907 | 47.73% | Redeemed | Nov-13 | 1674 | 1674 | 1673 | 27.47% | Redeemed | Oct-13 | 2372 | 2372 | 2372 | 38.95% | Redeemed | Sep-13 | 1347 | 1347 | 1347 | 22.12% | Redeemed | Aug-13 | 1536 | 1536 | 1536 | 25.22% | Redeemed | Jul-13 | 729 | 729 | 729 | 11.97% | Redeemed | Jun-13 | 963 | 963 | 963 | 15.81% | Redeemed | May-13 | 1868 | 1869 | 1869 | 30.69% | Redeemed | Apr-13 | 1962 | 1962 | 1962 | 32.22% | Redeemed | Mar-13 | 1627 | 1627 | 1627 | 26.72% | Expired | Feb-13 | 13 | 13 | 14 | 0.23% | Expired |
|
Capacity: 15 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 10/16/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|