Ormonde Wind Farm (Wind , Active) Location in the UK : England, Morecambe / Barrow in Furness Type of installation: Wind on/offshore: off Turbines :30 Capacity : 150 MW Approx Date of 1st power generation: September 2012
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Ormonde is a proposed Co-Generation development of wind and gas assets. It is intended to export the power through a grid connection point at Heysham. Power will be generated from 30 offshore wind turbines and an adjacent offshore power generation platform fuelled by gas from sub sea reservoirs.
On completion the wind farm will comprise 30 RePower 5M wind turbines with the capacity of 150 megawatts and expected to produce around 500 gigawatt hours of electricity every year.
Model: |
Senvion 5M
|
Start Speed: |
6
|
Capacity: |
5
|
Optimal Speed: |
12
|
Rotor Diameter: |
126
|
Stop Speed: |
30
|
Hub Height |
100 Avg for all turbines:100
|
Avg. Elevation: |
-20
|
Web Page: |
http://www.repower.de/wind-power-solutions/wind-turbines/5m/ |
Comment: |
|
Ormonde Energy Limited Belfast Berth Ramsay Way Barrow in Furness LA14 2TW England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Ormonde Offshore 150 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2509 / N00435W
District:
|
Applicant: |
Vattenfall
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
30 |
Turbine Capacity: |
5 |
Height of Turbines: |
|
Calculated capacity: |
150 |
Site Address: |
10km off Barrow on Furness, Heysham
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
306000 / 306000
|
Development Status: |
Operational
|
Application Submitted: |
7/12/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/1/2010
|
|
|
Generator Live |
2/22/2012
|
This Record Last Updated: |
8/23/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ormonde Wind Farm
|
Generator Type: |
Off-shore wind (RO code = RP)
|
Scheme : |
RO
|
Generator ID: |
R00020RPEN
|
Capacity: |
148000
|
Status: |
Live
|
Accreditation Date: |
7/12/2005
|
|
|
Commission Date: |
8/18/2011
|
|
|
Applicant: |
Ormonde Energy Limited
|
Applicant Address: |
Bridge End
Hexham
NE46 4NU
England
|
Address: |
Ormonde Energy Limited
Belfast Berth
Ramsay Way
Barrow in Furness
LA14 2TW
England
|
Site Name: |
Ormonde Wind Farm
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01164FWEN
|
Capacity: |
148000
|
Status: |
Live
|
Accreditation Date: |
7/12/2005
|
|
|
Commission Date: |
8/18/2011
|
|
|
Applicant: |
Ormonde Energy Limited
|
Applicant Address: |
Bridge End
Hexham
NE46 4NU
England
|
Address: |
Ormonde Energy Limited
Belfast Berth
Ramsay Way
Barrow in Furness
LA14 2TW
England
|
|
Assumptions: Capacity: 148000kW 148 MW, Thus over the month Capacity * 720 hours per month = 106560 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 46540 | 31.45% | Issued | 01/02/2018 | | | 42661 | 28.83% | Issued | 01/01/2018 | | | 57660 | 38.96% | Issued | 01/12/2017 | | | 47609 | 32.17% | Issued | 01/11/2017 | | | 50275 | 33.97% | Issued | 01/10/2017 | | | 47380 | 32.01% | Issued | 01/09/2017 | | | 31611 | 21.36% | Issued | 01/08/2017 | | | 5468 | 3.69% | Issued | 01/06/2017 | | | 26077 | 17.62% | Issued | 01/05/2017 | | | 29175 | 19.71% | Issued | 01/04/2017 | | | 39610 | 26.76% | Issued | 01/03/2017 | | | 44118 | 29.81% | Issued | 01/02/2017 | | | 53656 | 36.25% | Issued | 01/01/2017 | | | 4315 | 2.92% | Redeemed | 01/01/2017 | | | 43426 | 29.34% | Issued | Dec-16 | 0 | 10433 | 544 | 0.37% | Issued | Nov-16 | 0 | 48417 | 24209 | 16.36% | Retired | Oct-16 | 0 | 75530 | 37765 | 25.52% | Retired | Sep-16 | 0 | 91985 | 45993 | 31.08% | Retired | Aug-16 | 0 | 89526 | 44763 | 30.25% | Retired | Jul-16 | 0 | 63640 | 31820 | 21.50% | Retired | Jun-16 | 0 | 25759 | 13044 | 8.81% | Retired | Jun-16 | 0 | 25759 | 13044 | 8.81% | Issued | May-16 | 0 | 68275 | 34138 | 23.07% | Issued | Apr-16 | 0 | 74689 | 37345 | 25.23% | Issued | Mar-16 | 0 | 61958 | 30979 | 20.93% | Issued | Feb-16 | 0 | 10809 | 54048 | 36.52% | Issued | Jan-16 | 0 | 13555 | 67775 | 45.79% | Issued | Dec-15 | 0 | 16518 | 82590 | 55.80% | Redeemed | Nov-15 | 0 | 13282 | 66410 | 44.87% | Redeemed | Oct-15 | 0 | 64517 | 27085 | 18.30% | Revoked | Sep-15 | 0 | 58520 | 29260 | 19.77% | Redeemed | Aug-15 | 0 | 72545 | 36272 | 24.51% | Redeemed | Jul-15 | | 79083 | 39541 | 26.72% | Redeemed | Jun-15 | 29879 | 59758 | 29879 | 20.19% | Redeemed | May-15 | | 11356 | 56784 | 38.37% | Redeemed | Apr-15 | | 67976 | 33988 | 22.96% | Redeemed | Mar-15 | | 11048 | 55243 | 37.33% | Redeemed | Feb-15 | | 90590 | 45295 | 30.60% | Redeemed | Jan-15 | | 15374 | 76872 | 51.94% | Redeemed | Dec-14 | | 13523 | 67616 | 45.69% | Redeemed | Nov-14 | | 89329 | 44271 | 29.91% | Redeemed | Oct-14 | | 12104 | 60521 | 40.89% | Redeemed | Sep-14 | 15328 | 30441 | 15328 | 10.36% | Redeemed | Aug-14 | | 98634 | 49317 | 33.32% | Redeemed | Jul-14 | 18447 | 36693 | 18447 | 12.46% | Redeemed | Jun-14 | 15206 | 30211 | 15206 | 10.27% | Redeemed | May-14 | 28377 | 56753 | 28377 | 19.17% | Redeemed | Apr-14 | | 72519 | 36260 | 24.50% | Redeemed | Mar-14 | 53385 | 10677 | 53385 | 36.07% | Redeemed | Feb-14 | 72446 | 14489 | 72446 | 48.95% | Expired | Jan-14 | 67986 | 13597 | 67986 | 45.94% | Redeemed | Dec-13 | 82007 | 16401 | 82007 | 55.41% | Redeemed | Nov-13 | 32264 | 64527 | 32263 | 21.80% | Redeemed | Oct-13 | 64834 | 12966 | 64835 | 43.81% | Redeemed | Sep-13 | 41704 | 83406 | 41703 | 28.18% | Redeemed | Aug-13 | 35607 | 71214 | 35607 | 24.06% | Redeemed | Jul-13 | 16038 | 31809 | 16039 | 10.84% | Redeemed | Jun-13 | 28129 | 56258 | 28129 | 19.01% | Redeemed | May-13 | 45006 | 90013 | 45006 | 30.41% | Redeemed | Apr-13 | 33346 | 66692 | 33346 | 22.53% | Redeemed | Mar-13 | 48586 | 97171 | 48586 | 32.83% | Expired | Feb-13 | 43877 | 87755 | 43878 | 29.65% | Expired | Jan-13 | 57336 | 11467 | 57336 | 38.74% | Expired | Dec-12 | 62263 | 12452 | 62264 | 42.07% | Expired | Nov-12 | 52461 | 10492 | 52461 | 35.45% | Redeemed | Oct-12 | 41606 | 83211 | 41606 | 28.11% | Redeemed | Sep-12 | 51482 | 10296 | 51482 | 34.79% | Redeemed | Aug-12 | 29383 | 58767 | 29384 | 19.85% | Redeemed | Jul-12 | 29570 | 59140 | 29570 | 19.98% | Redeemed | Jun-12 | 38621 | 77242 | 38621 | 26.10% | Redeemed | May-12 | 28212 | 56071 | 28212 | 19.06% | Redeemed | Apr-12 | 32348 | 64696 | 32348 | 21.86% | Redeemed | Mar-12 | 29783 | 59155 | 29783 | 20.12% | Expired | Feb-12 | 39396 | 78792 | 39396 | 26.62% | Expired | Jan-12 | 44916 | 89831 | 44915 | 30.35% | Expired | Dec-11 | 45314 | 90629 | 45314 | 30.62% | Expired | Nov-11 | 31062 | 62124 | 31062 | 20.99% | Expired | Oct-11 | 11154 | 22182 | 11154 | 7.54% | Expired | Sep-11 | 5925 | 11747 | 5925 | 4.00% | Expired | Aug-11 | 711 | 829 | 712 | 0.48% | Expired |
|
Capacity: 300 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 30 m/s (67.11 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/6/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|